Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Bryan, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
https://theeagle.com/news/bryan-city-council-discusses-fy23-budget-and-capital-improvement-projects/article_0d9c11be-0fa6-11ed-8abd-878aa2d2a04e.html Bryan City Council members continued their Fiscal Year 2022-23 budget talks Thursday after two presentations regarding special revenue funds and capital improvement projects for the coming years. Chief Financial Officer Will Smith discussed special revenue funds which include management company funds for Midtown Park, the Phillips Event Center and the Queen and Palace Theaters. "We are looking at all of these funds as really new funds; we don't have a lot of history so we are being very careful about how we project these," Smith told the council. "But we are looking at total revenue for Midtown Park operations at $5.6 million ... and we are looking at total expenditures at $5.7 million. "For the Phillips Event Center, we are looking at golf revenues of about $900,000 ... and almost $5 million in expenditures. So, we are looking at ending operating funds at $300,000 [for the center]." As for the Queen and Palace Theater funds, Smith said they are projecting revenues and expenditures at about $1.2 million, and are looking at ending operating funds of about $63,000 for both theaters. Smith also discussed the proposed employee benefits fund for FY23, and told the council they are not recommending any employee contribution increases, city contribution increases or retiree contribution increases. For the city's FY23 Coulter Airfield fund, Smith said the total proposed revenues and expenditures are $1.3 million. City Engineer Paul Kaspar presented the council with current and future capital improvement projects that the city is funding in design and construction costs. One of the CIP projects includes work on South College Avenue, which is under phase one of construction from West Villa Maria Road to West Carson Street, he said; this was a FY22 project but will have construction efforts in 2023. "We have actively been in the design on phase one of this project from Villa Maria to Carson, and the design is essentially complete with a couple of fine touches left and we are waiting on land acquisition relating to the storm water detention pond," he told the council. "We are looking out to bid at the end of this year with completion by summer of 2024." Along with reconstruction on this project, Kaspar said they will provide two-lane roadway with raised medians, adding a storm sewer system with required detention, adding a shared use path on one side and sidewalk on the other, and will include lighting, landscaping and streetscaping. Kaspar mentioned another CIP project expected to be complete by 2024, which will extend Old Hearne Road. This project would include a wide concrete pavement in order to extend Old Hearne Road from State Highway 6 to Indian Trail; as well as extending Bryan Athletic Complex Drive from the Bryan Texas Utilities site to Old Hearne Road; and will include constructing a storm water system. An additional project in the works is the Hillside rear lot and drainage effort, and Old Oaks storm sewer improvements, Kaspar said. "Part of this project is that construction will be underway real soon, and a piece of it is being put into the street maintenance contract that is soon to be under construction," Kaspar told the council. "The anticipated rest of this project would be wrapping up by some time by the end of 2023. The design is essentially complete and we are waiting on some final land acquisition easements to be able to put it out to bid." The project includes reconstructing Hillside Drive to an inverted street with curbs and trench drains; convert existing inlets to junction boxes with leads to trench drains; construct flumes, which measure the flow of water in open channels, from back yards on the east side of streets to alleviate flooding; and replace existing sewer on Old Oaks Drive, Kaspar said. After the meeting, Kaspar noted they are working on traffic signal improvements, and as far as drainage, they are looking at acquiring some land for a regional detention pond. After both presentations, council members discussed the process of design standards for CIP construction projects and at what scope those are formed. The council will hold a public hearing on the proposed budget Aug. 23, and a public hearing on the proposed tax rate Sept. 6. ___________________________________- https://wtaw.com/bryan-city-council-receives-march-capital-projects-update/ Discussions with property owners along South College Avenue are occurring prior to finalization of construction plans, and the acquisition of the land for the detention pond is still underway. Once these items are complete, the project will release for bid, likely in May. The overall project is estimated to be complete in early 2024. _______________________________________ South College Avenue Phase 1( Villa Maria - Carson) A detailed scope has not yet been determined This project is included in the city's 2022-2026 Capital Improvement Plan (CIP). As of December 28, 2021, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Bid Results
Roads / Highways
$15,990,929.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 22, 2023
April 28, 2023
S College Ave, Bryan, TX
Related To This Project
Bryan, TX
--
Bryan, TX
Bid Date: Mar 07 2023
Bryan, TX
Bid Date: Mar 07 2023
Bryan, TX
Bid Date: Feb 15 2023
Bryan, TX
Bid Date: Feb 27 2023
Bryan, TX
--
Bryan, TX
--
Bryan, TX
--
Bryan, TX
Bid Date: Jan 31 2023
Bryan, TX
Bid Date: Mar 02 2023
Bryan, TX
Bid Date: Feb 16 2023
Bryan, TX
Bid Date: Mar 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.