BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a detention facility in San Antonio, Texas. Completed plans call for the renovation of a detention facility.

County payment methods are check or ACH. Payment and performance bonds are required Replacement of three passenger elevators and one freight elevator inside the Adult Detention Center (Main Jail). Demolish existing elevator equipment and replace with new. All new work installed shall be as per Design drawings and Specifications. Replacements include new driving machines or hydraulic pump units, power and logic controllers, electrical systems, hoist ropes, traveling cables, new cab enclosures car frames and platforms, door operators, and entrance doors and frames. All work shall include all labor materials, tools, equipment, testing, permits, inspections and commissioning.

Post-Bid

Jails / Prisons

$300,000.00

Public - County

Renovation

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
97
Bidding Soon
2,148
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2022

February 28, 2022

Project location map

200 N Comal St, San Antonio, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.