BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Calabasas, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Work on this project consists of replacement of the Kimberly Pressure Reducing Station located at the Kimberly Pump Station near the intersection of Kimberly Drive and Fountainwood Street in Agoura Hills, CA. The work entails replacing the existing 6" and 3" pressure reducing station located in a vault to an aboveground station with a new 6" and 4" pressure reducing valve. In addition, approximately 30 ft of underground 8-inch steel pipe upstream and downstream of the station will need to be replaced. A steel bypass line will need to be installed prior to work on the pressure reducing station. The station includes valves, fittings, and pipe supports. The Work is the replacement of the Kimberly Pressure Reducing Station. Time is the essence of the Contract. In accordance with the provisions of Section 24 of the Agreement, the Contractor shall begin the Work on the date specified in the written Notice to Proceed from the District and shall complete all of the Work included in the Contract within specified period of time per Section 24. Time stated for completion shall include final cleanup of the premises. Project Duration: 90 Calendar Days Liquidated Damages: $1,500.00 Per Calendar Day Bid Bond: 10% Questions regarding the project may be directed to Oliver Slosser, P.E., at (818) 585-7123. No bidder may withdraw his bid after the said time for bid openings until 60-days thereafter or until the District has made a final award to the successful bidder or has rejected all bids, whichever event first occurs. The Board of Directors of the District reserves the right to select the schedule(s) under which the bids are to be compared and contract(s) awarded. Engineer's Estimated Cost: $100,000 to $150,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Board of Directors of Las Virgenes Municipal Water District reserves the right to reject any and all bids and to waive any and all irregularities in any bid. TIME FOR COMPLETION - ninety calendar days

Award

Water / Sewer

$184,049.00

Public - County

Renovation, Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
88
Bidding Soon
1,918
All Active Projects
831
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2022

September 20, 2022

img_map_placeholder

To Be Determined, Calabasas, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.