Site work, paving and outdoor lighting for a mixed-use development in Pocatello, Idaho. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a transportation facility; water / sewer project; for paving for a sidewalk / parking lot; transportation facility; and transportation facility.

Schedule A: Loading Pad Improvements consists of construction of concrete pavement, new trench drains including retardant, and water delivery piping, electrical utilities, expanding and relining the evaporation pond, installation of a pond aeration system, installing apron lights, and other items. Approximate quantities include 5,000 SY asphalt pavement milling, 3,800 CY excavation, 175 CY subbase course, 840 CY base course, 1,200 LF trench drain with piping, 2,250 SY concrete pavement, 1,050 tons asphalt mix pavement, 780 CY pond sediment removal, 2 apron lights with conduit and cable, 675 LF fence removal, and 680 LF security fence. Schedule B: Sewer Connections consists of new sewer connections for existing modular units and removal of an existing septic tank. Schedule C: Concrete Retardant Off-Loading Pad consists of construction of a concrete pad with a catch basin. Approximate quantities include 25 CY of excavation, 13 CY of subbase course, 5 CY of base course, and 45 SY concrete pavement. Schedule D: Drive-Through Compound Improvements consists of constructing asphalt pavement in the drive-through compound including curb and gutter. Approximate quantities include 1,210 CY of excavation, 730 CY of subbase course, 245 CY of base course, 235 LF concrete curbing, and 605 tons asphalt mix pavement. Schedule E: Asphalt Parking Area consists of construction of an asphalt parking area. Approximate quantities include 260 CY of excavation, 170 CY of subbase course, 85 CY of base course, 135 tons asphalt mix pavement. Schedule F: Apron Expansion consists of construction of additional asphalt apron. Approximate quantities include 1,270 CY of excavation, 580 CY of subbase course, 410 CY of base course, 1,510 tons asphalt mix pavement, 1,452 SY asphalt millings shouldering. It is the intent of the Owner to issue a Notice of Award within 60 days after opening bids with project award. It is the Owner's intent to issue a Notice to Proceed to the Contractor to commence construction no later than Spring 2022 with enough contract time to complete the awarded work prior to June 23, 2022. The project must be substantially complete by June 23, 2022.

Bid Results

Transportation Terminals

$4,066,106.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Control, Field Quality Control Procedures, Contractor Quality Control, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Storm Water Pollution Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Special Function Doors, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Mercantile and Service Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Bases, Ballasts, and Paving, Base Courses, Subbase Courses, Aggregate Base Courses, Flexible Paving, Preparatory Coats, Asphalt Paving, Asphalt Paving Wearing Courses, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Planting, Planting Preparation, Soil Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts, Subdrainage, Subdrainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
8
Bidding Soon
120
All Active Projects
38
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2022

March 21, 2022

img_map_placeholder

1950 Airport Way, Pocatello, ID