BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Sugar Land, Texas. Contact the soliciting agency for additional information.

The City will notify the bidder by means of a work order of any work needing to be complete. Work orders will identify the requested repair locations, the anticipated type of repair or maintenance needed based on the bid items, and the type of work order. All work order communications will be conducted through the City's Traffic Engineering and Operations Division Representative or Project Inspector as stated in the following conditions. Types of Work Orders An Emergency Work Order is one that needs quick resolution due to the safety of the traveling public. Examples include but are not limited to repairing a damaged electrical service or conduit to restore lighting for a significant section of dark roadway or removing a damaged light pole blocking roadway traffic. The City assumes the awarded Contractor will have quick access to all necessary supplies to correct an issue of this type. A Maintenance Work Order is one that addresses most outages due to normal life of equipment. Examples include but are not limited to preventive maintenance or bulb / ballast replacements on high mast structures, roadway light poles, bridge lighting, and underpass / wall pack lighting. A Project Work Order is one that addresses the replacement / upgrade of a large quantity of material or replacement of damaged light poles and foundations from traffic accidents. An example of this would be the upgrade of a roadway segment or bridge lighting from HPS to LED. For material upgrades, the delivery date for all material needed should be submitted to the City within 10 calendar days from the work order date. Upon the City notifying the Bidder via a work order, the bidder shall mobilize and begin work within: 24 hours for an Emergency Work Order Seven (7) calendar days for Maintenance Work Order Fourteen (14) calendar days from the material delivery date for a Project Work Order. Proof of the material delivery date should be submitted to the City within 10 calendar days from the date of work order.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
58
Bidding Soon
2,653
All Active Projects
992
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2022

February 21, 2022

img_map_placeholder

Multiple Locations, Sugar Land, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.