BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in N Richmond, California. Contact the soliciting agency for additional information.

W9123622B5011: James River Maintenance Dredging between Rocklanding Shoals and Richmond Deepwater Terminal, for the U.S. Army Corps of Engineers (USACE) Civil Works Program, Virginia. THIS IS A PRE-SOLICITATION NOTICE. THIS IS NOT A SOLICITATION. DO NOT SUBMIT BIDS OR QUESTIONS IN RESPONSE TO THIS NOTICE. The Invitation for Bids (IFB) and accompanying documents will be issued electronically and will be uploaded to the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/ on or about 11th of July 2022. The solicitation is anticipated to be posted for 30 calendar days. THIS ACQUISITION IS A 100% TOTAL SMALL BUSINESS SET-ASIDE SOLICITATION The U.S. Army Corps of Engineers, Norfolk District intends to issue an Invitation for Bids (IFB) for the acquisition of maintenance dredging for the James River between Rocklanding Shoal and Richmond Deepwater Terminal, located in Hampton Roads, Virginia. This procurement will be conducted in accordance with FAR Part 14, Sealed Bidding Procedures. DESCRIPTION OF WORK Required work includes maintenance dredging by hydraulic cutter-head dredge, in various shoals between Rocklanding Shoal and Richmond Deepwater Terminal. The James River Federal Navigation project is broken into three-segments that include Lower, Middle and Upper James River Shoals. The Lower James River segment includes Rocklanding and Tribell Shoals. The Middle James River segment includes Goose Hill, Dancing Point to Swann Point, Jordan Point-Harrison Bar Channel to Windmill Point, and City Point channel. The Upper James River segment includes Richmond Deepwater Terminal (RDWT) to Hopewell, and RDWT Channel & Berthing Area. From Rocklanding Shoal to RDWT Channel and Berthing area, the Channel is maintained to a maximum required depth of -25 feet Mean Lower Low Water (MLLW). No widening or other channel framework modifications are proposed at this time. For the entire James River Project, one foot of advance maintenance and one foot of allowable over-depth dredging will be considered as part of the contract dredging pay prism. Advance maintenance dredging will be considered as part of the required pay prism. The maximum dredging pay depth is - 27 feet MLLW. The Lower and Middle James River shoals utilize overboard placement sites in the vicinity of the channels to place dredged material. The Upper James River shoals utilize upland placement sites to place dredged material generated by the project. The dredged material removed from the Upper James River shoals is expected to be placed in one of the designated Upper James River upland placement sites that includes RDWT, Willis Road, Hatcher's Island, Curles Neck, and Jones Neck. Annual maintenance dredging activities are estimated to generate up to approximately 2 MCY of pay volume for the Federal and non-Federal navigation project work. The Contractor shall be responsible for the following: dredging within the designated areas to the proposed required and allowable pay depths, maintaining an average daily plant production rate of 7,500 cubic yards per day on the middle and lower James River, maintaining an average daily plant production rate of 3,000 cubic yards per day on the Upper James River, achieve pumping distances between 7,500 and 25,000 linear feet for material placement, earthwork (spur and containment dike construction and management), discharging the material in the designated Government-furnished placement site. In accordance with the most recent version of Engineering Manual 385-1-1, the proposed IDIQ SATOC will include the requirement to replace spillway structures at several designated Government furnished upland placement sites. In addition, the upland placement sites identified in the statement of work will require earthwork, grubbing, seeding, grading, and other preparatory work to ensure effluent water leaving the designated upland placement site meets State water quality requirements. Communicating with the Port of Virginia maritime users to minimize impacts to vessel traffic, adjacent utilities, and dredging operations will be required. CONSTRUCTION TIME The Norfolk District is considering award of a 3-year SATOC IDIQ contract, with the entire contract award amount not to exceed $30,000,000 over the life of the contract. This office anticipates award of a contract for these services on or around September 13, 2022. BIDDER INSTRUCTIONS The requirement will be a 100% Total Small Business Set-aside Solicitation. In accordance with DFARS Part 236.204, the estimated Magnitude of Construction for this project is between $25,000,000.00 and $100,000,000.00. The applicable North American Industry Classification System (NAICS) Code is 237990 "Dredging and Surface Cleanup Activities," with a Small Business size standard of $32.5 Million. Contractors will be required to submit bid bonds with submittals. Payment and performance bonds will be required within 10 calendar days from contract award. In accordance with FAR Part 9.104 and 9.106, contractor responsibility will be determined prior to award by the Contracting Officer through the performance of a Pre-Award Survey or utilizing information from a previous pre-award survey and/or any performance data available. The apparent low bidder may be required to show that he has the necessary capital, experience, and owns or can procure the necessary plant or other resources to commence the work at the time prescribed in the specifications and thereafter to prosecute and complete the work safely and satisfactorily within the time specified. The below Pre-Award Survey Information will be requested of the apparent low offeror. This information is not required to be responsive to the Invitation for Bid. Current commitments and expected dates of completion. One (1) signed bank reference demonstrating adequate financial resources. If bidder's firm has a line of credit - provide information on how many figures bidder can borrow against the line of credit (i.e. medium 6 figures - exact line of credit is not required). The bidder shall provide the latest three (3) complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the bidder. The Government intends to award a Single Award Task Order Contract (SATOC) to the responsible bidder whose bid conforms to the terms of the solicitation, is determined fair and reasonable, and offers the best overall value to the Government as determined through the IFB, Sealed Bid process. This notice does not constitute an invitation for bid. The IFB and accompanying documents will be issued electronically and will be uploaded to the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/ on or about 11July 2022. Notification of any changes to this pre-solicitation will only be made on this website. Therefore, it is the offerors responsibility to check the website regularly for any posted changes to the pre-solicitation notice. Telephone calls or written requests for the IFB package will NOT be accepted. Prospective bidders are responsible for monitoring at https://piee.eb.mil/ to respond to the solicitation and any amendments or other information regarding this acquisition. IT IS THE SOLE RESPONSIBILITY OF THE BIDDER TO CONTINUALLY VIEW THE WEBSITE FOR CHANGES. No hard copies will be available. Prospective contractors MUST be registered in the DOD System for Award Management (SAM) database in order to obtain access to beta.SAM.gov. It is incumbent upon vendors to monitor beta.SAM.gov for the release of the solicitation, specification, drawings, and all subsequent amendments. SAM Registration must also be ACTIVE and current to be eligible for contract award. Information on registration and annual confirmation requirements may be obtained by calling 1-866-606-8220 or via the Internet at https://www.sam.gov. Lack of registration in the SAM database will prevent access to beta.SAM.gov and will make a bidder ineligible for award. Representations and Certifications Applications apply to this solicitation and may be completed online via the SAM.gov website. Inquiries may be directed to Ms. Tracey Strawbridge at Tracey.m.strawbridge@usace.army.mil and copy Mrs. Eartha Garrett at Eartha.D.Garrett@usace.army.mil. TELEPHONE INQUIRIES WILL NOT BE HONORED. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$100,000,000.00

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
172
Bidding Soon
3,323
All Active Projects
1,342
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 15, 2022

September 14, 2022

September 15, 2025

img_map_placeholder

Multiple Locations, N Richmond, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.