BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a road / highway in Plano, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Construction of wall stabilization improvements at Egyptian Way: Repair 2 walls and remove/replace damaged SH 161 frontage road pavement. Project Estimate: $1,000,000 - $5,000,000. The following questions were received on or before Thursday, January 13, 2022 Work is currently scheduled to be complete by end of March 2022 for wall 4. o Concrete drilled shafts, restraint beams, soil nails, tie-back post tension system for two retaining wall repairs o Relocation of City of Grand Prairie 12" water line o Budget Estimate $5 million o Reconstruction of PGBT service road pavement and storm sewer pipe repair o Contract term 12 months o D/M/WBE Goal 25% Construction of wall stabilization improvements at Egyptian Way: Repair 2 walls and remove/replace damaged SH 161 frontage road pavement

Post-Bid

Roads / Highways

$5,000,000.00

Public - City

Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
202
Bidding Soon
4,010
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2022

March 21, 2022

Project location map

Multiple Locations, Plano, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.