BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 8, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of an educational facility in East Chicago, Indiana. Completed plans call for the renovation of a 12,206-square-foot, one-story above grade educational facility.

A. During the course of the project, the Construction Manager may request that the Subcontractor provide proposals for modifications to the scope of work of the Project. Subcontractor shall comply with the requirements set forth for the procedures of this Section and other applicable portions of the Contract Documents. B. The procedures outlined in this Section may be required in whole or part depending on the type of modification requested by the Owner. The Construction Manager will direct the Subcontractor to the proper procedure based on the type of change requested. C. Should the Subcontractor proceed with a change to the work without proper authorization the Subcontractor relinquishes all rights for any claims for additional compensation or time. D. If the Subcontractor proceeds with a change to the work without proper authorization, and the Owner desires the work to be completed as originally documented in the Project Documents the Subcontractor shall remedy the unauthorized work to the originally documented condition without additional compensation or time. E. The Subcontractor shall advise the Construction Manager immediately if it is determined that a delay in the acceptance or rejection of a proposed change will impact the cost of the Project or the time to complete the Project. Lacking this notice the Subcontractor shall not be entitled to additional compensation or time for the acceptance or rejection of the proposed change. F. Should the Subcontractor proceed with work that is currently associated with a documented proposed change request or a pending submitted change request without approval or rejection of the change request the Subcontractor shall not be entitled to additional compensation or time due to the acceptance or rejection of the change.

Bid Results

Educational

$4,000,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
262
Bidding Soon
3,175
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2022

February 3, 2022

Project location map

410 E Columbus Dr, East Chicago, IN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.