BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2023 at 8:00 PM

Updated January 27, 2024

Renovation of an educational facility in New Britain, Connecticut. Completed plans call for the renovation of a educational facility.

As of October 24, 2023, this project has been completed by the awarded general contractor. Construction Costs: Greater Than $500,000 Set-Aside Requirements: SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25% Cost Estimate Range: $ 3,864,339.00 To $ 4,271,112.00 Contract Time Allowed: Calendar Days: 270 Liquidated Damages: $ 1,948.00 Per Calendar Day Beyond Substantial Completion. $ 1,625.00 Per Calendar Day Beyond 90 days After Substantial Completion. Prevailing wages are required on this project, in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. 31-55a concerning annual adjustments to prevailing wages. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.Construction Costs: Greater Than $500,000 Set-Aside Requirements: SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25% Cost Estimate Range: $ 3,864,339.00 To $ 4,271,112.00 Contract Time Allowed: Calendar Days: 270 Liquidated Damages: $ 1,948.00 Per Calendar Day Beyond Substantial Completion. $ 1,625.00 Per Calendar Day Beyond 90 days After Substantial Completion. Prevailing wages are required on this project, in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. 31-55a concerning annual adjustments to prevailing wages. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed.

Occupancy

Educational

$3,938,000.00

Public - State/Provincial

Renovation

103

35

26

4

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
844
Active Projects
208
Bidding Soon
6,824
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2022

May 4, 2022

Project location map

185 Main St, New Britain, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.