BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in North Charleston, South Carolina. Completed plans call for site work for a water / sewer project.

As of May 2023, construction is anticipated to begin in December of 2023. Award Details Contract Award Date: Jul 25, 2022 Contract Award Number: 70Z04722F43000010 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: VEP4UN7LDMK5 Contractor Awarded Name: WHITING-TURNER CONTRACTING COMPANY, THE Contractor Awarded Address: Baltimore, MD 21286-3020 USA Base and All Options Value (Total Contract Value): $111299708.00 This project will construct new waterfront, shore structures and utility/supporting facilities required to homeport and berth 4 NSCs at Pier November (4 dedicated berths at Pier November). The scope of work includes, but is not limited to: demolition and replacement of the existing Pier November and of damaged bulkhead, removal and backfill of contaminated soils and removal of uncontaminated underwater released aggregate. Dredging will include spoils from between Piers Mike and Papa for constructing the new Pier November as well as the removal 3 pieces of submerged equipment in the area of the collapsed bulkhead. The construction includes a new Pier November, support facilities, site/groundwork and all associated utilities. New Shore Tie service requirements for electrical, potable water, fire protection, sewer, bilge water, and compressed air services will be provided for 5 NSCs at Pier November and bulkhead mooring. In addition, a new duct bank will be installed to provide C5IT connectivity between pier Papa and Pier Mike. The new work for this project will also involve additional paving of the ground surface to provide an access road to Pier November. All future parking, buoy storage, and MAT Cutter Support Team (CST) requirements will be addressed by an on-going IDP/Master Plan. Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction. ADD: Period of Performance: 1580 calendar days from award for the Base Items and Option Item as per addendum 12. The visiting individuals will need a valid ID (Driver License, TWIC Card, Military Retired, Active, or Dependent ID) to gain access onto the Station. In addition, due to COVID-19 concerns and safety, during the site visit all personnel are to wear cloth face covering or mask and remain socially distanced where practicable

Award

Water / Sewer

$111,299,708.00

Public - Federal

Site Work

66

72

339

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
71
Bidding Soon
778
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

December 4, 2023

Project location map

1050 Register St, North Charleston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.