BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of a residential development in Franklin, Massachusetts. Completed plans call for the renovation of a residential development.

#101156 Removal and replacement of existing oil fired furnaces with new ducted VRF indoor air handling unit and wall mounted VRF indoor units in selected residential units Sub Bid Date and time (01/20/2022 at 12:00 PM ET) in Sub project The Project consists of: Removal and replacement of existing oil fired furnaces with new ducted VRF indoor air handling unit and wall mounted VRF indoor units in selected residential units. A delayed notice to proceed is possible for work to be completed in the non-heating season. The work is estimated to cost $258,000. 15.3% for minorities and 6.9% for women Completion- 90 consecutive calendar day

Bid Results

Residential Subdivision

$25,000.00

Public - City

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
605
Active Projects
236
Bidding Soon
4,497
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2022

February 21, 2022

Project location map

87 Central Park Terrace, Franklin, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.