Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Appleton, Wisconsin. Completed plans call for the renovation of a municipal facility.
Requesting bids for a contractor to provide all materials and labor to replace nine (9) HVAC units at one of the County buildings in Appleton. The scope of work includes replacing 9 HVAC units with each having a furnace section and AC unit with rooftop mounted condenser units Contractor shall provide all equipment and ancillary items needed for complete and fully operational systems. In addition to the drawings the follow items shall also be included in the scope of work: - The building will be occupied by tenants of the County from 8 am to 5 pm Monday through Friday. Contractor may work throughout the business day, however the contractor must make efforts to minimize disruptions for the tenant. It would be a preference for contractor to start earlier than each 8 am each day if possible in order to help limit disruptions to the tenant. Contractors would be allowed to start as early as 6 am and would be allowed to work into the evening if needed. Activities that create excessive or continues loud noises shall be completed outside of the tenant's business hours whenever possible. - To aid in minimizing disruptions to the buildings tenants, contractor shall not start project until all part are available to complete the project. Once started the contractor shall work full consecutive days throughout the workweek for the duration of the project in order to minimize any HVAC outages or disruptions. Interior furnace units shall be replaced one at a time in order to limit widespread heating outages. To assist in consolidating crane time, the rooftop AC units can all be removed at the same time as a group and new units can be lifted to the roof at the same time, however contractor must work to get the new Ac units online as each furnace in completed in order to minimize AC outages. - Contractor shall provide the County with a project schedule at least 5 days before starting work. - Contractors must follow any County and tenant Covid-19 requirements including wearing face covering, daily temperature checks, daily health survey, daily sign in and any other federal, state or local requirements. - Contractor shall provide all hoisting needed for the rooftop condensers and interior HVAC units. - Contractor is responsible for all permits associated with the project Installation of new units must meet all manufactures recommended installation guild lines or requirements. Installation shall also meet all local code requirements. - Perform start up and testing of the complete new system. - Site clear all components from the old system. -Provide a one year parts and labor warranty for new equipment.
Award
Municipal
$161,570.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2022
March 4, 2022
3375 W Brewster St, Appleton, WI
Related To This Project
Appleton, WI
Bid Date: Jun 01 2021
Appleton, WI
Bid Date: Mar 13 2023
Appleton, WI
Bid Date: Mar 03 2023
Appleton, WI
Bid Date: May 10 2023
Appleton, WI
Bid Date: Mar 29 2023
Appleton, WI
--
Appleton, WI
Bid Date: Mar 30 2023
Appleton, WI
Bid Date: Apr 03 2023
Appleton, WI
Bid Date: Feb 23 2023
Appleton, WI
Bid Date: Feb 23 2023
Appleton, WI
Bid Date: Feb 23 2023
Appleton, WI
Bid Date: Mar 06 2023
Appleton, WI
Bid Date: Feb 27 2023
Appleton, WI
Bid Date: Feb 27 2023
Appleton, WI
Bid Date: Feb 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.