BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Robbinsville, New Jersey. Completed plans call for the renovation of a educational facility.

Construction is expected to start in late June 2022. The robbinsvile board of education will receive bids for partial roof replacement at pond road middle school together with all work incidental thereto in accordance with the requirements of the drawings and specifications prepared by fraytak veisz hopkins duthie . Roofing removal and replacement of roof area #1 with .060 EPDM SinglePly Membrane Roofing System with a Twenty (20) Year - NDL Warranty and all associated work. Provide and install pre-finished aluminum metal edge, fascia extender, coping and all associated work, as indicated on the drawings. Remove and replace the existing skylights with polycarbonate impact resistant sealed skylights, provide new insulated curb, replace the painted gypsum board in the light well and all associated work, as indicated on the drawings. . Provide and install new portable skylight guards and all associated work, as indicated on the drawings. . Provide and install new mechanically keyed stainless steel flashing / counterflashing, weep holes, architectural cmu and all associated work, as indicated on the drawings. . Provide and install retro-fit roof drains,Provide and install expansion joint assembly at rising wall tie-in and all associated work, as indicated on the drawings. . Provide and install roof expansion joints, pre-finished aluminum cover and all associated work, as indicated on the drawings. . Provide and install new rooftop unit rails and all associated work, as indicated on the drawings. . Provide and install area divider(s), as indicated on the drawings. . Temporally remove existing exterior roof ladder to facilitate new work, scrape, prime, paint ladder and reinstall, as indicated on the drawings. . Provide and install new prefinished aluminum gutters, downspouts and all associated work, as indicated on the drawings. . Provide and install new exterior steps and anodized aluminum handrails to rooftop mechanical room and all associated work, as indicated on the drawings. . Provide and install new FRP door, hardware, threshold and all associated work, as indicated on the drawings. Modify existing hollow metal door frame as required to suit revised door height, paint door frame. Color as selected by the Architect.

Award

Educational

$751,000.00

Public - City

Renovation

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
459
Active Projects
209
Bidding Soon
4,131
All Active Projects
1,910
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2022

June 27, 2022

img_map_placeholder

150 Pond Rd, Robbinsville, NJ


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.