BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2023 at 7:00 PM

Updated May 28, 2024

Site work for a civil project in Edmonton, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.

Bridge Culvert Replacement, Grading, Granular Base Course, Cold Milling, Asphalt Concrete Pavement and Other Work 58:08 to 10 19 km E of Hwy 35 - Hwy 88 Peace Region APPROXIMATE QUANTITIES: 3 signs Pre-Construction Advertising Sign 23 day Total Suspended Solids (TSS) Testing 149 110 tonne Supply of Aggregate - With Option 20 000 tonne Crush, Haul and Stockpile Aggregate (Des 4-25) 15 910 cubic metres Common Excavation 19 120 cubic metres Borrow Excavation - Contractor Supplied 76 460 square metres Topsoil Placement 46 units Access Improvement 735 metres Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 520 metres Culverts - Remove and Dispose (C.S.P.) (over to 700 mm dia.) 768 metres Culverts - Supply and Install (600 mm dia. C.S.P.) 212 metres Culverts - Supply and Install (800 mm dia. C.S.P.) 765 metres Smooth Wall Steel Pipe - Supply and Install (750 mm dia.) 378 metres Smooth Wall Steel Pipe - Supply and Install (1050 mm dia.) 806 cubic metres Grouting of Abandoned Culverts 4 260 cubic metres Channel Excavation 3 820 cubic metres Subgrade Excavation 22 620 square metres Stabilization Geotextile - Supply and install (Class 1A) 9 980 tonne Granular Base Course Des. 2 Class 25 1 530 tonne Gravel Surfacing Des. 4 Class 25 301 000 square metres Cold Milling Asphalt Pavement 2 540 metres Cutting of Pavement 107 300 tonne Asphalt Concrete Pavement -EPS- Mix Type M1 (PG 58-28) 6 messages Durable Pavement Message - Stop Bar 88.14 km Roadway Lines - Supping Paint and Painting (Directional Dividing and 2 Edge Lines) 120 metres Removal and Disposal of Existing Guardrail 214 metres Strong Post W-Beam Guardrail - Supply and Install 28 signs Install Sign - Less than 1 m2 35.98 km Milled Rumble Strip - Gap Edge Line 334 posts Flexible Guide Post/Delineator - Round - Supply and Install 525 metres Trenching and Backfilling 420 meters Secondary Cable - Supply and Install - 2c#10 Teck 90 HL Cable 7 units Street Light Standard - Supply and Install - 13m x 2.5m Single Davit & Luminaire 1 units Distribution Enclosure - Supply and Install B.F. 75647 1 lump sum Traffic Accommodation for Bridge Construction 36 metres Welded Steel Pipe - Supply and Install (B.F. 75647) 67 cubic metres Heavy Rock Riprap (Class 1) (B.F. 75647) 140 cubic metres Backfill - Non Granular - Clay Seals (B.F. 75647) 1 lump sum Roadway Work (B.F. 75647) Contractor to supply all materials. Documents can be obtained from www.purchasingconnection.ca.

Award

Roads / Highways

$17,330,878.00

Public - State/Provincial

Site Work

23

17

4

2

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
35
Bidding Soon
581
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

March 1, 2022

Project location map

Multiple Locations, Edmonton, AB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.