Site work and renovation of a residential development in Ault, Colorado. Completed plans call for the renovation of a residential development; and for site work for a residential development.

SCOPE The scope of the project includes: 1. Site clearing and excavation. 2. Contractor will be responsible for locating all buried utilities (including private) prior to excavation. 3. Provide tracking control to prevent tracking from the site onto public roadways. 4. Provide and construct a clear span steel frame building 60' x 87' x 21' tall building (no windows) with appropriate tenant finishes. 5. Appropriate girts, purlins, carriers, and grade boards as detailed by engineered design. 6. Appropriate trim (ridge, rake, eave, corner, etc.) installed to provide a finished appearance. 7. Colors must be approved by Director of Facilities from standard color scheme. 8. All construction must be permitted and comply with County Building codes. Fees for construction permit through the County will be paid for by the County directly and should not be included in the proposal. 9. Contractor must coordinate any necessary permits with the local fire authority. Any fees for these permits are to be paid for by contractor. 10.Contractor must develop a stormwater management program (SWMP) that meets EPA and State of Colorado requirements. Contractor will be the operator for such permits and will be responsible for any violations/fines for non-compliance with the regulatory requirements. 11.Contractor must apply for right of way, access, and grading permits if required. Any fees for these permits are to be paid by the contractor. 12.Remove and properly dispose of all trash generated by construction activities off site. 13.Contractor will coordinate all utility installations & startup and be responsible for connections and installation. Fees for utility plant investment fees will be paid for by the County directly to the utility provider. 14.Geotechnical and soils testing for construction has been performed and will be provided. 15.All foundation/site work and soil compaction will be verified by County's third-party inspector prior to any vertical erection. 16.Payment (100% of contract price) and Performance (100% of contract price) bonds required. No Bid bond required. 17.Davis-Bacon and Buy American requirements are NOT required. Construction Start March 16, 2022 Certificate of Occupancy October 15, 2022 Construction End October 31, 2022

Bid Results

Residential Subdivision

$898,419.00

Public - County

Renovation, Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
65
Bidding Soon
1,266
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

March 16, 2022

Project location map

41150 Tegan Ave, Ault, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.