BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2024 at 8:00 PM

Updated August 7, 2024

Site work for a power facility in Ault, Colorado. Completed plans call for site work for a power facility.

Ault Substation Stage 10 to replace 13.8kV oil reactors with government furnished air core reactors, replace six government furnished 230kV CCVTs on existing structures, replace four 115kV line switches at Windsor Tap and Hygiene Tap on existing structures. Any questions to be answered during the site visit must be submitted via Any questions to be answered during the site visit must be submitted via email John Pratt / jprattwapa.gov NLT 5 July 2024 if you intend to attend the site visit. The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 Calendar Days after notice to proceed. The time stated for completion shall include final cleanup of the premises. The estimated order of magnitude for this acquisition is $250,000 to $1,000,000 This solicitation is issued as a 100% Small Business Set-Aside *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Power Plant

$1,000,000.00

Public - Federal

Site Work

58

5

16

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
77
Bidding Soon
1,284
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2024

August 15, 2024

Project location map

12910 Co Rd 86, Ault, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.