BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2025 at 7:00 PM

Updated November 4, 2025

Site work, new construction and renovation of a medical facility in Brampton, Ontario. Completed plans call for the construction of a 731,000-square-foot, 12-story above grade medical facility.

The Peel Memorial Phase 2 Redevelopment Project is to be delivered using the Progressive Design-Build (Target Price) delivery model. Once completed, the expanded Peel Memorial Hospital will include: -Multi-storey patient tower with up to 250 inpatient beds, with the capacity to add more beds in the future. -24/7 emergency department designed to offer a wide range of urgent and emergency medical care. -Expanded post-acute care services, helping to free up additional space for acute care beds at Brampton Civic Hospital. -Enhanced mental health and addictions programs, including medically assisted withdrawal management. -Specialized services for seniors, including dementia care. -Rehabilitation and complex continuing care services. -9 new inpatient dialysis stations and expanded outpatient services. -New and enhanced outpatient clinics, including a fracture clinic. *Contract amount was not released for publication. Early construction begun in Spring 2025. Activities include building a temporary access road to support the next stages of construction. In October 2025, Infrastructure Ontario (IO) and Osler have signed a Development Phase Agreement (DPA) with Bird Design-Build Construction Inc., which is now the development partner selected to advance the project requirements including the design, schedule and pricing. October 25, 2025: The Development Phase is now underway with Bird Design-Build Construction Inc., the Development Partner selected to further develop the project requirements and design, schedule, pricing, and risk parameters for William Osler Health System's (Osler) Peel Memorial Hospital Phase 2 Redevelopment. Infrastructure Ontario (IO) and Osler have signed a Development Phase Agreement with Bird Design-Build Construction Inc. after evaluations following an open, fair, and competitive request for proposals (RFP) process that began in October 2024. The Bird Design-Build Construction Inc. team includes: - Applicant lead: Bird Design-Build Construction Inc. - Design team: Cannon Design Ltd. - Construction team: Bird Design-Build Construction Inc. The project is being delivered through IO's Progressive Design-Build (Target Price) delivery model. Once the Development Phase is complete, Osler and the Bird Design-Build Construction Inc. team will have the option to sign a project agreement to proceed with the construction phase, which would include agreements on detailed designs and a target price.

Award

Medical

$500,000,000.00

Public - State/Provincial

New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
665
Active Projects
389
Bidding Soon
4,887
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2025

January 1, 2026

Project location map

20 Lynch St, Brampton, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.