Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 10, 2022 at 7:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in St Peters, Missouri. Completed plans call for site work for a playground / park / athletic field; road / highway; and for paving for a road / highway.

Construction of a 10 foot wide concrete trail along Old Highway 94 between Christy Dr and Schaeffer Park. Installation of wayfinding signage along Hackmann Rd (between S Old Highway 94 and McClay Rd) and along McClay Rd (between Hackmann Rd and Harvester Church of the Nazarene).

Award

Roads / Highways

$849,066.00

Public - County

Paving, Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
102
Bidding Soon
1,627
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2022

March 2, 2022

Project location map

Old Hwy 94 S, St Peters, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed