BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bridgeport, Washington. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Award Details Contract Award Date: Apr 27, 2023 Contract Award Number: W912DW23C0010 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: PUVYFG5N1NH8 Contractor Awarded Name: NORTHBANK CIVIL AND MARINE, INC. Contractor Awarded Address: Vancouver, WA 98660-1222 USA Base and All Options Value (Total Contract Value): $6,185,000.00 "Disclosure of the Magnitude of Construction Projects," the magnitude of the project is estimated between $1,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Chief Joseph Dam Spillway Sump Pumps and Controls The proposed project will be a competitive, firm-fixed price construction project.Magnitude of Construction is between $1 to $5 millionThe North American Industrial Classification System code is 237990, which has a size standard of $39.5 million.The contract is anticipated to be awarded in First Quarter of 2023.The Seattle District, U.S. Army Corps of Engineers has a requirement to increase the spillway sump pump capacity to keep up with current spillway water intrusion at Chief Joseph Dam, Bridgeport, Washington. To increase the spillway dam sump pump capacity the existing pumps and controls will be removed and replaced along with associated piping and valves. Inflows from previous years indicate that August, September, and October are the optimal months to perform this work as those are generally the lowest inflow periods of the year. The implementation of the proposed project would need to be phased to ensure continuity of drainage. The sump pump system is an important safety system at the CJD as it removes water intrusion from the horizontal and vertical concrete joints in the spillway. Dam structural failure is possible if water intrudes into the monolith concrete joints.The proposed work includes removal and replacement of the following: 1) Two existing Vertical Line-Shaft Vertical Pumps, 2) Six Existing Submersible Pumps, 3) Associated Piping and Valves, 4) Existing Control Equipment with a redundant sensor system and 5) Electrical System components, such as circuit breakers and conductors to serve the new equipment power needs. Additional features of work include: 1) Structural and Concrete Work to include core drilling up to 14 inches and grated walkway replacement, 2) Sump Shaft debris removal and 3) Installation of an Electric Hoist System.The expected construction duration is 18 months. Work restrictions will be in place for this requirement with the intent of ensuring the sump pump capacity is available for continuity of drainage. Construction will need to be staged and scheduled so that USACE dam operations are not impacted.After solicitation issuance, contractors may view and/or download this solicitation and all amendments at the following internet address: https://sam.gov/ and https://piee.eb.mil/.In order to download the solicitations and amendments in PIEE, there are 10 general steps a vendor must follow. A complete list can be viewed at the following site:https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml#step5For instructions on how to post an offer, please refer to the Posting Offer demo:https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.It is the Offerors responsibility to monitor the https://sam.gov/ and PIEE at https://piee.eb.mil web sites for amendments to the solicitation. You must be registered with the System Award for Management (SAM) and PIEE, to receive a government contract award. The Government reserves the right to use only the Internet as notification of any amendments to this solicitation. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/viewSolicitationRFP.xhtml' to obtain more details.* *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$6,185,000.00

Public - Federal

Paving, Site Work

54

36

2

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
4
Bidding Soon
72
All Active Projects
22
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2023

December 11, 2023

img_map_placeholder

To Be Determined, Bridgeport, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.