Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 7, 2022 at 7:00 PM
Updated February 14, 2024
Site work and paving for a mixed-use development in Waverly, Iowa. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Water Main construction, HMA Patch, PCC Paving, Pressure Relief Valve, Erosion Control Est. Completion Date:shall be completed between June 15th, 2022 and August 15th, 2022 The project limits are the intersection of 16th Street SW and 4th Ave. SW to approximately 200 feet north of the intersection. Included in the project are trenched Ductile Iron Pipe water main and associated appurtenances, a Pressure Relief Valve, HMA patching, concrete driveway work, turf restoration and traffic control. HMA Patch Remove and Replace 6 inch PCC Driveway Traffic Control Mobilization Water Main, Trenched, Ductile Iron Pipe (DIP), Fittings by Count, Ductile Iron Valve, Gate, DIP, 6 In. Valve, Gate, DIP, 10 In. Connect to Existing Water Main Pressure Relief Valve Exploratory Excavation Turf Restoration 1 LS Perimeter and Slope Sediment Control Device, 12 In. Dia. 50 LF
Post-Bid
Water / Sewer
$129,300.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 8, 2022
June 15, 2022
4th Ave SW & 16th St SW, Waverly, IA
Related To This Project
Waverly, IA
--
Waverly, IA
Bid Date: Sep 22 2022
Waverly, IA
Bid Date: Sep 08 2022
Waverly, IA
Bid Date: Feb 10 2023
Waverly, IA
Bid Date: Feb 02 2021
Waverly, IA
Bid Date: Mar 07 2023
Waverly, IA
Bid Date: Mar 02 2023
Waverly, IA
Bid Date: Sep 14 2023
Waverly, IA
Bid Date: Mar 29 2022
Waverly, IA
Bid Date: Dec 21 2022
Waverly, IA
Bid Date: Dec 20 2022
Waverly, IA
Bid Date: Dec 13 2022
Waverly, IA
Bid Date: Sep 01 2022
Waverly, IA
Bid Date: Sep 22 2022
Waverly, IA
Bid Date: Nov 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
