EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 25, 2022 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Algonquin, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

As of January 25th 2022 this project has been cancelled and does not plan to rebid. The Village of Algonquin is now accepting sealed bid proposals for BUNKER HILL DRIVE REHABILITATION. Bid proposals for this project will be considered not only on the basis of cost, but also on past performance, experience and ability to perform the work. The Village of Algonquin reserves the right to accept the bid deemed to be in its own best interest, which is based on all of the above considerations. Bid will be awarded to the lowest responsible bidder determined in the exclusive discretion of the Village Board of Trustees. Description of Work The project includes street rehabilitation (full depth reclamation) to the following streets: o Bunker Hill Drive o Sherman Road to Greens View Drive (4,300 ft.) o Parkside Court (250 ft.) o Pine Grove Court (300 ft.) The project will also include spot curb and gutter replacement, sidewalk replacement and utility rehabilitation. This project includes full reconstruction of the intersection of Parkside Court and Bunker Hill Drive. The bike path along the south side will be resurfaced with a minimum of 2 1/2 " of surface course and 6" of stone base for the entire limits and a push button will be installed at Jacobs High School. No proposals or bids will be considered unless accompanied by such bond or check. Submission Format Bids shall be made on the forms furnished by the Village and shall be submitted no later than the specified closing time in an opaque sealed envelope addressed to: Village of Algonquin, attention: Deputy Clerk, 2200 Harnish Drive, Algonquin, IL 60102. Envelopes should be clearly marked, "Sealed Bid - BUNKER HILL DRIVE REHABILITATION". The bids will be opened at this location and read aloud. The Village of Algonquin reserves the right to reject any or all parts thereof, or waive any formality or technical errors, and to make the award in the best interest of the Village. Public Works This contract calls for the construction of a "public works," within the meaning of the Illinois Prevailing Wage Act, 821 ILCS 130/.01 et seq. ("the Act"). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than current "prevailing rate of wages" (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Illinois Department of Labor publishes the prevailing wage rates on its website http://www.state.il.us/agency/idol/rates/rates.HTM. The Illinois Department of Labor revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the Illinois Department of Labor website for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor's website. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including by not limited to, all wage requirements and notice and record keeping duties. Each bidder shall adopt a written sexual harassment policy in compliance with ILCS 5/2-105 (1992). Bidder agrees to comply with Substance Abuse Prevention on Public Works Projects Act, 820 ILCS265/1 et seq. (2008). As required by the Act, the Bidder agrees to file with the Village, prior to commencing work, its written substance abuse prevention program. It is the responsibility of the vendor/contractor/subcontractor to comply with all applicable provisions of FOIA. The regulations of the State of Illinois Freedom of Information Act (FOIA) 5 ILCS 140, apply to all records of the vendor/contractor/subcontractor pertaining to this authorization or contract. When requested by the Village of Algonquin, the vendor/contractor is required to provide all records requested within no more than three (3) business days, at no cost to the Village of Algonquin. Questions All questions regarding this project should be directed to Lee M. Fell, Christopher Burke Engineering, Ltd. at 847-823-0500. The project includes street rehabilitation (full depth reclamation) to the following streets: Bunker Hill Drive - Sherman Road to Greens View Drive (4,300 ft.) Parkside Court (250 ft.) Pine Grove Court (300 ft.) The project will also include spot curb and gutter replacement, sidewalk replacement and utility rehabilitation. This project includes full reconstruction of the intersection of Parkside Court and Bunker Hill Drive. The bike path along the south side will be resurfaced with a minimum of 2 1/2 " of surface course and 6" of stone base for the entire limits and a push button will be installed at Jacobs High School.

Project Abandoned

Roads / Highways

$1,070,000.00

Public - City

Paving, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Warranties
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Plaques
Division 12 - Furnishings

Division 12 - Furnishings

Other Furnishings, Site Furnishings, Bicycle Racks
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
197
Bidding Soon
2,686
All Active Projects
1,305
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

May 1, 2023

img_map_placeholder

Bunker Hill Dr, Algonquin, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bunker Hill Drive Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.