BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a playground / park / athletic field in Raymore, Missouri. Completed plans call for site work for a playground / park / athletic field; and for the construction of a playground / park / athletic field.

The Parks and Recreation Department plan to construct a new skate park. The location of the new skate park facility will be moved from its current location to a more open area with parking and utilities available at 909 South Madison. The project scope shall be a design/build concept to be provided by respondents. Design and construction for a community wide skate park facility to serve skaters of various ages, abilities and skill levels. - Final design must be a multi-use facility that is designed for skateboards but can accommodate inline skates, bicycles, etc. and plan for expansion within the available space and location. - The Project must meet the safety standards for the latest skatepark design principles for skateboarders, scooters, and BMX riders to develop their skills. - The size will be determined during the design process, but shall be in the range of 7,000 to 12,500 sq. ft. depending on the layout and cost. - All recognized methods of formal skate park construction (concrete, steel, composite, etc.) should be fully explored throughout the design process. Our intent is to explore opportunities for poured-in place concrete, precast concrete, new modular units and utilization of equipment at our current facility that is safe and can be relocated. Final design will be determined during the design process. - Elements to consider for inclusion but not limited to: Quarter pipe, cradle, bowl, handrails, banks, ledges, manual pads, jersey barrier, ramps (straight and cured), jumps, steps (multiple locations & heights), transition areas and ledges. - Site features to consider: bleacher/spectator area(s), park benches, picnic tables, bottle filler fountain with hose spigot, shade structures, bike rack and permanent trash receptacles. - Relocation and installation of a public art piece located at the current facility. - Installation of an electrical panel with a minimum of 60 amps including 4 outlets and a keyed locked housing. - Use of current trees and/or planting of trees for shade and a landscape border should be considered as part of the plan. Removal of trees for site design and construction is acceptable with authorization of the Parks and Recreation Director. - Work with staff to provide a concept/layout plan to be presented to the Parks and Recreation Board in a work session environment. - Provide a minimum of one top elevation drawing and one three-dimensional drawing of the final plan/layout approved by the Parks and Recreation Board. A site plan must be approved by the Planning and Zoning Commission. Perform all site-related land, topographic and soils surveys/research as necessary in order to formulate appropriate facility design, location, grade, and other infrastructure cost considerations and recommendations. Facility project budget of $225,000.00 cannot be exceeded. Budget should be based upon overall project needs and considerations from design through and including all construction. Design process should anticipate and identify all necessary construction and development costs for the site. - Skate Park facility to be open to walk-up traffic (unsupervised). No admission fee anticipated for this facility. -No fencing is required. -Facility to be fully constructed and operational by July 1, 2022

Award

Playgrounds / Parks / Athletic Fields

$225,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
34
Bidding Soon
713
All Active Projects
277
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

April 11, 2022

img_map_placeholder

909 S Madison St, Raymore, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.