BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Saddle Lake, Alberta. Completed plans call for site work for a water / sewer project.

BLMS WTP Upgrades will include work related to its raw water pump station, raw water aeration system, its hypochlorite dosing system and general mechanical/process improvements and repairs. Work of this Contract comprises of the following: .1 Raw Water Pump Station – Replacement of one raw water pump motor (2.2kW (3HP) 1750 RPM/600V/3P). The contractor will be required to remove one raw water pump and deliver to EC &M. EC&M to service the raw water pump. Once service of pump is complete the contractor will collect the pump and deliver to site (BLMS WTP), where the pump will be kept as a shelf spare. .2 Raw Water Aeration System – Provide assistance and coordination of installation of the aeration system (supplied and installed by Nexom). Contractor to provide periphery support (i.e interconnecting pipework and electrical items) to ensure complete install of aeration system. The contractor is required to provide 3 phase power at the blower building. Installation and commissioning of the new aeration system should be scheduled to minimize disruption to the WTP operations. .3 Hypochlorite Dosing – Installation and commissioning of a second chlorine dosing point. The dosing point will be installed on the treated water distribution pipework. The scope will include the integration of the primary and second dosing point operation. Refer to section 43 32 69.1. .4 Redundant equipment - Remove all redundant chemical dosing pipework identified in the drawings. Relocate, install, and commission the sulphuric acid dosing system next to the poly dosing system. Remove all remaining Potassium permanganate and polymer dosing equipment as per drawing 15599 PR 01. .5 Reservoir vents - Extend four reservoir vents to the outside of the WTP building. The exist four vents that currently provides ventilation for the treated water reservoir at the WTP currently terminate on the main floor of the plant. The vents should be modified, extended up through the roof and terminated outside the building. The details of the vents are shown on drawings 15599 D 01, 15599 PR 01 and the extension should be field fitted (to be approved by engineer) to avoid clashes with current installed equipment and pipework. .6 Distribution pumps- Installation of VFDs and new control panel for the distribution pumps. Change distribution pumps’ motors from single phase to 3 phase. Replacement of 2 distribution pump (Refer to section 43 24 12). .7 Recirculation line - Installation of a recirculation line at the WTP distribution pumps. Refer to drawing 15599 PR 01, 15599 PR 02 and 15599 PR 03.

Post-Bid

Water / Sewer

$500,000.00

Public - Federal

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
5
Bidding Soon
111
All Active Projects
41
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 7, 2022

March 9, 2022

September 30, 2022

img_map_placeholder

Buffalo Lake Metis Settlement WTP, Saddle Lake, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.