BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2025 at 8:00 PM

Updated May 2, 2025

Site work and paving for a road / highway in Saint Louis, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Construction of the Brickline Greenway North Connector segment along the west side of Grand Boulevard from Natural Bridge to Cass, the south side of Cass from Grand to Spring, and the west side of Spring from Cass to Page. This scope includes the greenway trail and new sidewalk, curbs, seatwalls, unit pavers, street reconfiguration, signals, street and pedestrian lighting, utilities, trees, landscaping, irrigation, trail signage and wayfinding, and site furniture. The work consists of furnishing all material, labor, tools, equipment, and supervision necessary for the construction of the items noted above in accordance with all the requirements of these specifications, and the drawings made a part thereof. Existing site amenities damaged during construction shall be replaced at no cost to the Owner. A 5% Bid Security in the form specified in the bidding documents is required. The District reserves the right to waive informalities in bids, and to reject any and all bids submitted. DBE Contract Goal: bidders to certify that the bidder is familiar with the DBE Program Requirerrients in this contract. The contract DBE goal for the amount of work to be awarded is 8% of the total project price including all alternates with O trainees for O hours each. Questions should be directed via the solicitation on Bid Express. All requests for clarification on these bidding documents must be received in writing by April 21st, 2025, at 2:00 PM

Post-Bid

Roads / Highways

$3,500,000.00

Public - County

Paving, Site Work

322

8

190

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
129
Bidding Soon
1,242
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 30, 2025

Project location map

Brickline Greenway, Saint Louis, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.