BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a civil project in Bargersville, Indiana. Completed plans call for site work for a water / sewer project.

The Proposal must be made on the forms provided in the Contract Documents. Each bid shall be accompanied by a cashier's or certified check, drawn on an acceptable bank, or an acceptable bidder's bond, in an amount not less than five percent (5%) of the total amount of the bid, payable to the Town of Bargersville, Indiana. The bidder to whom a contract for work is awarded will be required to furnish a Performance and Payment Bond executed on the specified forms and acceptable to the Town, in the amount of one hundred percent (100%) of the Contract. The bidder must supply all the information required by the bid proposal form. Partial payment will be made monthly based on an approved payment request. The Contractor and all subcontractors will be required to comply with required Federal and State labor regulations including Equal Employment Opportunity, Non-segregated Facilities, and Affirmative Action requirements. The Town of Bargersville, Indiana, reserves the right to reject any and all proposals or parts there-of and to waive all responsibility for irregularities in bids. Bids may be held by the Town of Bargersville, Indiana, for a period of not to exceed sixty (60) days from the date of the opening of the bids for the purpose of reviewing the bids and the investigation of the qualifications of bidders, prior to awarding of the Contract. Project Description: The project shall include the installation of a new 12” water main on the east side of Saddle Club Road that extends from the existing water main on the north side of New Battle Lane to the north side of Whiteland Road. This new water main will be installed via both directional drill and open cut. All work is specified in the Construction Schedule and Specifications for said project.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
121
Bidding Soon
1,211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2022

February 24, 2022

Project location map

Saddle Club Rd, Bargersville, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.