Site work for a mixed-use development in Santa Paula, California. Working plans call for site work for a playground / park / athletic field.

1.GRADING: Remove all organic materials from excavation area (800 sqft.) Excavate and remove soil 3' in depth and 5' beyond building perimeters (800 sqft.) Bottom of excavation needs to be compacted to 90% (800 sqft.) Install soil in lifts of 8" and compact to a minimum of 90% All lifts must be tested every 2' by soils engineer All on-site soil must be used. Any import must be approved by soils engineer Final grade will be brought up to match existing grade taking in account of proper drainage away from structure (800 sqft.) Sand will need to be added to bid and left on-site for final grading completed by others (5 cubic yards) 2. FOUNDATION: Install new concrete area in front of new structure to match existing and connect to existing walkways per city of Santa Paula's standards (350 sqft.) 3.UTILITIES: Disconnect utilities from existing restroom facility and rerouted to the new restroom facility. All utilities will need to be routed to within 5' of the new facility approx. 50' to the west. Water (80 LF.) Sewer 4" SDR 35 (80 LF.) Electrical (80 LF.) All utilities will need to connected to new restroom facility once structure is completed. All water connections will need to flushed prior to connection completion. The new structure will have stub outs for water and sewer. Electrical connections are terminated at new panel located on the exterior wall of new structure with new 100 amp service and wire pulled. Provide meter if required. All utilities on exterior of restroom are the contractors responsibility. Interior connections are completed by others. Pre-Qualification for Bidders: Not Required Bid Bond Percentage: 100%

Final Planning

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Site Work

Subscribe For Documents

183 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
69
Bidding Soon
1,713
All Active Projects
732
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2022

September 1, 2022

img_map_placeholder

300 S Steckel Dr, Santa Paula, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.