BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, new construction, remodeling and renovation of a mixed-use development in Parkland, Florida. Conceptual plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; for the remodel of a playground / park / athletic field; for the renovation of a playground / park / athletic field; sidewalk / parking lot; and for paving for a playground / park / athletic field.

As part of the City's Strategic Planning Workshop, held April 2021, staff was tasked to come up with ways to enhance the levels of service at Pine Trails Park. During the workshop, staff provided the City Commission with three levels of enhancements to the park. At the direction of the City Commission during the Strategic Planning effort, staff was instructed to proceed with Level 1 and Level 2 enhancements. These improvements will involve improving the landscaping around the perimeter, providing irrigation, new sod for Fields 4 and 5, baseball fields A, B, and C, as well as the Great Lawn, the Amphitheater and playground areas. Artificial turf will be installed on Field 3, and the bathrooms will receive a complete interior remodel, including partitions, countertops, sinks, toilets, and fixtures. Other improvements are expected to be budgeted over the course of the next couple fiscal years, as indicated above. The Capital Improvement Program fund, utilizing cash reserves, will be tapped to fund $3,135,000 of the new improvements. The City's Infrastructure Replacement Plan will fund $893,000 of the mprovements to the existing facilities and park elements. In order to maintain both Pine Trails Park and Terramar Park at these higher levels of service, additional staff will be needed, as well as additional equipment. This project is in included in the City of Parkland 2023-2027 Capital Improvement Plan (CIP). As of December 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$1,095,000.00

Public - City

New Construction, Paving, Remodeling, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
52
Bidding Soon
1,147
All Active Projects
519
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

img_map_placeholder

10555 Trails End, Parkland, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.