Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 24, 2026 at 8:00 PM
Updated July 7, 2026
Site work, paving, outdoor lighting and new construction of a mixed-use development in Clearwater, Florida. Design plans call for site work for a water / sewer project; transportation facility; for paving for a transportation facility; for outdoor lighting for a transportation facility; and for the construction of a transportation facility.
The project scope includes the new construction of 7 passenger bridges, baggage area expansion, 1 new gate, a passenger waiting area, the renovations to join 2 safety checkpoints, a new taxiway to parallel to Runway 18-36, airfield access to a future aviation-related tenant, grading, drainage, airfield electrical signage and lighting, asphalt pavement and floodplain mitigation. Scope details have not been finalized. As of June 24, 2026, design is underway. This is a CMAR Procurement project. Anticipated receipt of CMARs GMP is May 2028. Construction is scheduled to begin September 2028 and be completed December 2032.
Design
Transportation Terminals
$110,000,000.00
Public - County
New Construction, Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 13, 2026
14700 Terminal Blvd, Clearwater, FL
Related To This Project
Clearwater, FL
Bid Date: May 15 2024
Clearwater, FL
--
Clearwater, FL
Bid Date: May 30 2024
Clearwater, FL
Bid Date: May 31 2024
Clearwater, FL
Bid Date: Jun 06 2024
Clearwater, FL
Bid Date: Jul 08 2024
Clearwater, FL
Bid Date: Jun 11 2024
Clearwater, FL
Bid Date: May 23 2024
Clearwater, FL
Bid Date: Jun 12 2024
Clearwater, FL
Bid Date: Apr 30 2024
Clearwater, FL
--
Clearwater, FL
Bid Date: Jun 05 2024
Clearwater, FL
Bid Date: May 22 2024
Clearwater, FL
--
Clearwater, FL
Bid Date: May 03 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
