BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a civil project in Johnstown, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

INFRASTRUCTURE PROPOSAL Ledge Rock Center Commercial Metropolitan (the Owner) will receive emailed Infrastructure Proposals for 1.) Ledge Rock Center Public Improvements, 2.) Ledge Rock Center Retail Commercial East Public Improvements, and 3.) Highway 60 Public Improvements (the Project) to Todd Johnson, Terra Forma Solutions, Inc., todd@terraformas. com due on January 31, 2022 at 1:00 P.M. At such time, Bids received will be Publicly opened and read aloud via zoom meeting at the following: https://udenver.zoom.us/j/89308374917."> https://udenver.zoom.us/j/89308374917. A general description of the Work to be performed includes but not limited to: Demolition, Clearing, Removals, Dewatering, Erosion Control, Earthwork, Sanitary Sewer, Underdrain, Dewatering, Storm Sewer, Watermain, Dry Utilitiy Sleeves, Asphalt, Concrete, Traffic Control , Signage, Pavement Markings, and all other work necessary to complete the work in accordance with Contract Documents, including the plans, specifications, and special provisions. Owner anticipates award to start the initial work and Notice to Proceed week of March 1, 2022 or as soon as construction agreement is fully executed. Contractors mobilization date should reflect this date within the submitted schedule.. Bid packages will be available after 4 P.M. on January 5, 2022 by requesting the packages via email to Todd Johnson, Terra Forma Solutions, Inc. todd@terraformas.com. An optional pre-bid conference will on held online at 3:00 P.M. January 11, 2022 via zoom meeting at the following: https://udenver.zoom. us/j/84201261651. General Description and Scope of Work: The Work generally consists of furnishing all labor, materials, equipment, and any and all other items necessary to complete the installation of the work in accordance with Contract Documents including the plans and specifications. Owner anticipates award to start the initial work and Notice to Proceed week of March 1, 2022 or as soon as construction agreement is fully executed. Contractor's mobilization date should reflect this date within the submitted schedule. Plans: (1) LRC Biological assessment 2021 11 24 (2) LRC Filing 1 Final Plat 2021 12 03 (3) LRC HWY 60 General Scope of Work 2022 01 05 (4) LRC Overall Concept Site Plan 2021 11 24 (5) LRC Phase 1 ESA 2021 07 06 (6) LRC Preliminary Geotech DN51,099-115-R1 2021 11 15 (7) LRC Public Improvement Plans 2021 12 03 (8) LRC Retail Commercial East 2022 01 03 (9) LRC SWMP Early Grading 2021 12 15

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
74
Bidding Soon
1,355
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2022

March 1, 2022

Project location map

CO-60, Johnstown, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.