Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a mixed-use development in Moorpark, California. Conceptual plans call for the renovation of a transportation facility; and for site work for a sidewalk / parking lot.
The City of Moorpark's Parks, Recreation and Community Services Department is seeking artist proposals to design, fabricate and install artwork for the Moorpark train station north parking lot located at 300 East High Street. The location provides an opportunity to develop an engaging visual experience that will be meaningful to residents and visitors and serve as significant gateway to the City of Moorpark. Funding for the project is provided by the City's Art In Public Places Fund, which consists entirely of development fees collected specifically for public art projects. The Moorpark Arts Commission (Commission) is tasked with reviewing conceptual design and placement of all Art In Public Places projects, and will participate in proposal review and artist selection. Applications received after the deadline will not be reviewed. The City is not obligated to notify applicants when incomplete applications are received. Incomplete applications will not be reviewed. It is the responsibility of the applicant to ensure that applications are complete and arrive by the deadline. Any professional artist who permanently resides in the State of California is eligible to apply. Artists working in all mediums may apply however sculpture in metals, concrete, and other solid mediums are preferred. Current City of Moorpark Arts Commissioners, employees of the City of Moorpark and their business partners and/or their immediate family members may not apply. BUDGET $175,000 for Artwork design, engineering, fabrication, installation, and artist fee. The budget is all-inclusive, and a proposed price must include all design fees; travel expenses; all labor, materials and fabrication costs; lighting and signage (if necessary); insurance costs; site-preparation costs; traffic control costs; engineering expenses; shipping and transportation to the site; installation; any applicable permit fees and taxes; any other expenses related to the design, fabrication, installation, and documentation of this project. The budget includes an Artist's fee of $25,000 to be paid upon final acceptance of the completed Artwork by the Moorpark City Council. If the fabrication and/or installation of the Artwork or any portion of the Artwork under this Agreement is a public work pursuant to Labor Code Section 1720 et seq. and requires a licensed contractor, such work will require the payment of prevailing wages, as determined by the State of California Department of Industrial Relations (DIR). Labor Code Section 1725.5 requires that any such contractors and/or subcontractors be registered with the DIR before performing any work on the project. Artists are responsible for travel expenses including travel to interviews and meetings, if invited. No separate budget exists to support project-related travel for artists during the selection phase. The site for the artwork(s) is the Moorpark Station North Parking Lot located at 300 East High Street, opposite Magnolia Street in Moorpark, California. This location is an active commuter train station providing service to both Metrolink and Amtrak customers. A major renovation of the north parking lot to significantly expand the capacity and improve the appearance of the site is scheduled to begin in January of 2022 and be completed in the fall of 2022. The renovated site will feature 95 parking stalls and a 10-foot wide raised pedestrian walkway that will cross the center of the parking lot, connecting the train station to High Street. Six locations alongside the pedestrian walkway have been identified as potential locations for the installation of footings to anchor artwork, providing an opportunity for a single integrated art piece spanning the walkway, stand-alone installations, or a combination thereof (see Attachment 1). The method of contractor selection has not been determined at this time.
Conceptual
Transportation Terminals
$175,000.00
Public - City
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 9, 2023
300 E High St, Moorpark, CA
Related To This Project
Moorpark, CA
Bid Date: Oct 22 2021
Moorpark, CA
Bid Date: Oct 29 2021
Moorpark, CA
--
Moorpark, CA
--
Moorpark, CA
--
Moorpark, CA
Bid Date: Oct 04 2023
Moorpark, CA
Bid Date: Aug 25 2023
Moorpark, CA
Bid Date: Jul 08 2021
Moorpark, CA
Bid Date: Jul 27 2023
Moorpark, CA
Bid Date: Jun 27 2023
Moorpark, CA
Bid Date: Jul 21 2023
Moorpark, CA
Bid Date: Jun 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.