BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a swimming pool in Eagle Pass, Texas. Completed plans call for site work for a swimming pool.

**As of March 7, 2022 This project is already awarded to RAFSA Construction with the awarded amount of $72,280. Estimated Time of Completion 5 weeks. The City of Eagle Pass (CITY) is soliciting this request for Competitive Sealed Proposals (CSP) from General Contractors (GC) for the Swimming Complex Fencing project (IFB#2022-007). The scope of the project includes but not limited to remove and replace existing fence and gates in the perimeter of the Eagle Pass Swimming Complex located at 1990 2nd St., Eagle Pass, Texas, 78852. A Payment Bond and Performance Bond is required in the full amount of the bid The scope of work shall consist of the following but not limited to: Remove and replace 1,280 linear feet of the perimeter fence around complex will be replaced with 8 ft chain link fence #9 Gauge and install 146 galvanized 10 ft poles for fence. 100 linear feet of fence around the 3'-4' pool will be replaced with 6 ft chain link fence #9 Gauge and install 11 2"-galvanized 8 ft poles for fence. 100 linear feet of fence around the Kiddie Pool will be replaced with 3 ft chain link fence #9 Gauge and install 11 2"-galvanized 5 ft poles for fence. Corners and gate anchors will be installed for 3 gates around the perimeter of swimming complex. Concrete will beused toset fence posts and gates. For more details, pleasesee EXHIBIT A, B & C. Please note that Eagle Pass is considered a remote location by many delivery companies and couriers. Offerors must allow adequate time for delivery, and not assume overnight delivery will reach the CITYpriorto opening date and time. Throughout the course of the project, the bidder will work with the City Parks and Recreation Department Director who will review all project progress by the Contractor/Firm/lndividual and provide project oversight. - Removal of all existing trees interfering with fencingsinstallation along the fence line. - Contractor must pull a permit from the City of Eagle Pass Planning Department. - - Contractor will be responsible for locating all utility fines and protecting them in place. - Contractor must complete scope of work in 5 weeks (35 days). - Kiddie Pool fencing (Pink dashed outline in. Exhibit A ) installation must be done without breaking concrete. Contractor must use alternative method, preferably fencing posts sleeves utilizing existing posts, to complete the removal anddnstallation of the new kiddie pool fencing.

Award

Swimming Pools

$72,280.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
7
Bidding Soon
74
All Active Projects
33
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 10, 2022

March 14, 2022

March 31, 2022

img_map_placeholder

1990 2nd St, Eagle Pass, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.