BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2022 at 8:00 PM

Updated January 27, 2024

Site work and paving for a civil project in Milton, West Virginia. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The approximate quantities of work to be bid upon are described as follows: 1 LS Mobilization/Demobilization; 1 LS Videotaping of Project Area; 1 LS Erosion and Sediment Control; 557 LF Remove Existing Sewer and Replace with 12" D.I. Gravity Sewer Line; 769 LF 10" PVC Gravity Sewer Line; 177 LF Remove Existing Sewer and Replace with 10" D.I. Gravity Sewer Line; 805 LF 8" PVC Gravity Sewer Line; 470 LF Remove Existing Sewer and Replace with 8" PVC Gravity Sewer Line; 613 LF 24" HDPE Storm Line; 1,470 6" HDPE DR-9 Forcemain (Directional Bore); 810 LF 6" PVC DR-18 Forcemain; 1,780 LF 4" PVC DR-18 Forcemain; 285 LF 4" PVC Customer Service Lateral; 110 LF 4" D.I. Customer Service Lateral; 180 LF 24" Steel Casing (Bore & Jack); 180 LF 12" Steel Casing (Bore & Jack); 53 LF 8" Steel Casing (Bore & Jack); 12 EA 48" Dia. Manhole Base, Cone Top, Regular Casting; 6 EA Remove Existing Manhole and Replace with New 48" Dia. Manhole Base, Cone Top, Regular Casting; 1 EA 48" Diameter Storm Manhole; 45 VF 48" Diameter Manhole Riser Pipe; 1 EA Doghouse Manhole, 4 EA WVDOH Type B Storm Inlets; 1 EA Remove and Replace Drop Inlet; 4 EA 12"x4" D.I. Wye Connection; 2 EA 10"x4" PVC Wye Connection; 5 EA 10"x4" D.I. Wye Connection; 16 EA 8"x4" PVC Wye Connection; 3 EA 2" Pressure Inline Cleanout; 3 EA 1/2" Combination Vacuum/Air Release Valve; 1,315 LF WVDOH Type "B" Trench Repair; 235 LF WVDOH Type "C" Trench Repair; 1,710 LF HMA Driveway Repair; 185 LF Concrete Driveway Repair; 718 LF Gravel Driveway Repair; 1 EA Tie Proposed Forcemain Into Existing Forcemain; 1 EA Tie Existing Gravity Sewer Line Into Proposed Manhole; 1 EA Tie Gravity Sewer Line Into Proposed Contract 2 Manhole; 31 EA Reconnect Existing Service Lateral; 1 LS Abbot Lane Lift Station Rehabilitation; 1 LS Sunset Lift Station Rehabilitation; 1 LS Jim's Camping Lift Station; 1 LS Decommission Existing Grinder Station; 2 EA 70kW Portable Generator; 4,300 LF Reclamation of Disturbed Area; $11,458.00 WVDOH Inspection Fee Allowance. The Work will be substantially completed within 330 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 360 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000.00 per day. Bids shall be accompanied by a certified check or bid bond payable to Milton Municipal Utility Commission in an amount equal to five percent (5%) of the base bid The Milton Municipal Utility Commission reserves the right to reject any and all bids. QA Date February 8, 2022

Award

Water / Sewer

$3,405,003.00

Public - City

Paving, Site Work

44

26

31

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
41
Bidding Soon
818
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

March 21, 2022

Project location map

Multiple Locations, Milton, WV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.