Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Grafton, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The project is officially known as "Edgewood Drive & Hillside Court Reconstruct (Pulverize and Overlay)". The project is described as repaving a portion of Edgewood Drive and Hillside Court with the additional alternative 1 of repaving Trail Way Drive and Trail Way Court with the additional alternative 2 of repaving Shady Lane. This project will consist of furnishing all labor, materials, and equipment necessary for the construction of the Edgewood Drive & Hillside Court Reconstruct (Pulverize and Overlay) located in the Town of Grafton. Base Bid - A. Edgewood Drive and Hillside Court - Approx. 3,700 feet - Pulverizing existing pavement, 4" overlay in two lifts, shouldering, and restoration. B. Work is described in general, non-inclusive terms as furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the: 1. Pulverization and reshaping of approximately 9,045 SY of asphalt pavement. 2. Placement and compaction of approximately 1,370 tons of asphalt binder and approximately 820 tons of asphalt surface. 3. Placement of approximately 700 tons of 1-1/4" stone as shouldering. 4. Final Restoration of all disturbed areas. ALTERNATIVE 1 A. Trail Way Drive and Trail Way Court - Approx. 2,700 feet - Pulverizing existing pavement, 4" overlay in two lifts, shouldering, and restoration. B. Work is described in general, non-inclusive terms as furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the: 1. Pulverization and reshaping of approximately 6,600 SY of asphalt pavement. 2. Placement and compaction of approximately 1000 tons of asphalt binder and approximately 600 tons of asphalt surface. Edgewood Drive & Hillside Court Reconstruct (Pulverize and Overlay) ADVERTISEMENT FOR BIDS (C) 2022 STANTEC | 193805822 00 11 13 - 2 3. Placement of approximately 20 tons of 3/4" stone as driveways along the length of the project and placement of approximately 510 tons of 1-1/4" stone as shouldering. 4. Final Restoration of all disturbed areas. ALTERNATIVE 2 C. Shady Lane - Approx. 1,000 feet - Pulverizing existing pavement, 4" overlay in two lifts, shouldering, and restoration. D. Work is described in general, non-inclusive terms as furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the: 1. Pulverization and reshaping of approximately 2,450 SY of asphalt pavement. 2. Placement and compaction of approximately 370 tons of asphalt binder and approximately 220 tons of asphalt surface. 3. Placement of approximately 190 tons of 1-1/4" stone as shouldering. 4. Final Restoration of all disturbed areas.
Post-Bid
Roads / Highways
$170,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2022
February 28, 2022
Multiple Locations, Grafton, WI
Related To This Project
Grafton, WI
Bid Date: Feb 18 2022
Grafton, WI
--
Grafton, WI
--
Grafton, WI
Bid Date: Dec 21 2023
Grafton, WI
Bid Date: Mar 05 2024
Grafton, WI
--
Grafton, WI
--
Grafton, WI
--
Grafton, WI
Bid Date: Mar 02 2021
Grafton, WI
--
Grafton, WI
--
Grafton, WI
--
Grafton, WI
Bid Date: Jun 08 2023
Grafton, WI
--
Grafton, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.