BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Rector, Arkansas. Completed plans call for the renovation of a 34,000-square-foot educational facility.

2121 Project scope consists of a mechanical change out and modifications to approximately 34,000 square feet of the existing elementary school at Rector School District. Scope includes, but is not limited to, change out of existing 3 ton gas fired furnaces and addition of ERVs including electrical modifications. Additional work includes roof penetrations and flashing, ceiling demolition and modifications, and miscellaneous accommodations for new equipment. Plans, specifications, bid forms, and other contract documents may be examined at the office of the architect. While contract documents can be examined at the following plan rooms, bidders should use caution in doing so: Jonesboro Blueprint222 Madison Street Jonesboro, AR 72401(870) 932-4349Southern Reprographics901 W. 7th Street Little Rock, AR 72201(501) 372-4011Obtaining contract documents through any source other than the Design Professional or their representative(s) is not advisable due to the risks of receiving incomplete or inaccurate information. Additional sets of documents may be obtained for use by subcontractors and material suppliers upon receipt of $50.00 per set which is refundable less cost of reproduction (50% refundable), and less postage/shipping costs if applicable, upon return of documents in good condition within 3 days after the bid date. No partial sets will be issued. Bidders shall conform to the requirements of the Arkansas licensing laws and regulations for contractors, and shall be licensed before his or her bid is submitted. The Rector School District encourages all small, minority, and women business enterprises submit bids for capital improvements. Encouragement is also made to all general contractors that in the event they subcontract portions of their work, consideration is given to the identified groups. The owner reserves the right to waive this requirement and/or schedule additional meetings. Bidders are advised that funding in part is provided by the Elementary and Secondary School Emergency Relief Fund. The Davis-Bacon Acts apply to contractors and subcontractors performing work on this project. Federal wage rates will apply to this project. The owner reserves the right to reject any and all bids, or to waive any formalities.

Post-Bid

Educational

$1,780,000.00

Public - City

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
15
Bidding Soon
264
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

April 11, 2022

img_map_placeholder

700 W 5th St, Rector, AR

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.