BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Smithville, Ohio. Completed plans call for the renovation of a educational facility.

As of July 3, 2023, construction is complete. Base Bid: $850k, Alt 1 $100k, Alt 2 $250k Single Prime Construction Work for the following: General Trades Work, which includes Sub-Contractor Work for the following: Plumbing, HVAC, Electrical, Security and Hazardous Abatement Work. The Project consists of all labor, material and services necessary for the timely and proper completion of the Wilbur L. Berkey Fieldhouse HVAC, Boiler and Door & Window Replacement ]as described in the bid documents related to the construction of the addition and renovations at the existing library Project Location: 100 Smithie Drive, Smithville, Ohio 44677 All bids must be accompanied by a Bid Guaranty in the form of either a Bid Guaranty and Contract Bond for the full amount of the bid (including all add alternates) or a certified check, cashier's check, or an irrevocable letter of credit in an amount equal to 10% of the bid (including all add alternates), as described in the Instructions to Bidders. The District reserves the right to waive irregularities in bids, to reject any or all bids, and to conduct such investigation as necessary to determine the responsibility of a bidder. The estimated construction cost for the Work being performed at this time is $850,000.00 Wilbur L. Berkey Fieldhouse: The work consists of removal and installation of existing HVAC / Boiler Equipment, removal and installation of existing Hollow Metal Doors & Windows, Hazardous Abatement Work, Electrical demolition and new electrical work (power and lighting Work), Acoustical Ceiling Work, exterior Concrete Work, Door Security Work and new Aluminum Window / Exterior Storefront Systems and doors. D. Weight / Locker Room Building: ALTERNATE NO. 2 (ENTIRE BUILDING). The work consists of the removal of existing exterior pad mounted HVAC units, ductwork removal (inside), removal of hollow metal frames, doors and hardware, removal of existing interior electrical lighting. New Work consists of installation of new exterior HVAC pad mounted units, electrical power and interior lighting work, new hollow metal frames, doors and hardware,door security, interior metal liner panels and exterior concrete work.

Occupancy

Educational

$850,000.00

Public - City

Renovation

32

19

23

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
156
Bidding Soon
2,967
All Active Projects
1,185
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 8, 2022

May 31, 2022

August 19, 2022

img_map_placeholder

100 Smithie Drive, Smithville, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.