BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2022 at 8:00 PM

Updated November 15, 2023

Site work and paving for a bridge / tunnel in Poplarville, Mississippi. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Owner reserves the right to waive any informality in the bidding and to reject any or all bids. CONTRACT TIME: 70 Working Days Guard Rail, Bridge End Section, Type I Thrie-Beam Guard Rail, Terminal End Section Right-of-Way Markers (Type I) 4" Wide Thermoplastic Edgfe Stripe, (Continuous White) (60 mils) Additional Construction Signs 4" Wide Thermoplastic Traffic Stripe, (Continuous Yellow) (60 Miles) Two-Way Yellow Reflective High Performance Raised Marker Wattles, 20" Temporary Silt Fence (Type II) (AOS 0.15 - 0.84) mobilization clearing and grubbing removal of bridge at station 165+76 unclassified excavation (fm) borrow excavation (f.m.e.) (contractor furnished) (class 7) channel excavation (fm) granular material (lvm), (class 6, group c) crushed stone hot mix asphalt, st 9.5 mm hot mix asphalt, st 19 mm asphalt for prime coat (ea-1) guard rail, w-beam guard rail, bridge end section, type i thrie-beam guard rail, terminal end section roadway construction surveying right-of-way markers (type i) maintenance of traffic additional construction signs 4" wide thermoplastic edge stripe (continuous white) (60 mils) 4" wide thermoplastic traffic stripe (continuous yellow) (90 mils)

Bid Results

Bridges / Tunnels

$519,883.00

Public - County

Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
75
Bidding Soon
760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2022

April 25, 2022

Project location map

Multiple Locations, Poplarville, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.