BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Wadley, Georgia. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Extent of asphalt concrete paving work shown on drawings. Prepared graded aggregate sub-base is specified in this section. Saw-cutting of edges of existing pavement is specified in this section. It is the intent that, under this contract, a portion of the site, as defined on the drawings and / or as required for construction activities, be cleared and grubbed in preparation for the earthwork. Protection of existing trees. CONCRETE,MASONRY,METALS,WOOD, PLASTICS, AND COMPOSITES 2. Felling of trees and removal of stumps, roots, tree debris, and other vegetation within the defined "Limits of Work". 3. Topsoil stripping. 4. Clearing and grubbing. 5. Removal of wood framed structure(s) completely, including but not limited to above ground construction, foundation walls, footings, and basements. 6. Removal of concrete loading dock structure(s). 7. Removing above-grade improvements. 8. Removing below-grade improvements. 9. Removal of miscellaneous debris; Debris includes residential garbage, construction materials and other material not indigenous to site. 10. Construction of necessary barriers and barricades where required. The wage determination (including any additional classification and wage rates conformed under a.(2) of this section) and the Davis Bacon poster (WH-1321) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can easily be seen by the workers. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work. Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work.

Award

Educational

$10,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

139

37

23

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
24
Bidding Soon
419
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2023

October 23, 2023

img_map_placeholder

104 Bedingfield St, Wadley, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.