Published March 8, 2022 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a fire / police facility in Pittston Twp, Pennsylvania. Completed plans call for the renovation of a fire / police facility.

Project has been awarded to the companies below but awarded amount was not confirm. CONTRACT # 1 - GENERAL CONSTRUCTION - H & P Construction, Inc. CONTRACT # 2 - HVAC CONSTRUCTION - Spotts Brothers Inc CONTRACT # 3 - ELECTRICAL - Mark Whitehead Electrical Contractor Inc The Jenkins Township Board of Supervisors will consider the received bids for award at their public meeting on February 9, 2022 at 7:00 P.M. Bids are invited for the following contracts: CONTRACT # 1 - GENERAL CONSTRUCTION CONTRACT # 2 - HVAC CONSTRUCTION CONTRACT # 3 - ELECTRICAL Prospective bidders are urged to familiarize themselves with the site and review the scope of work and construction documents. Any contractor who does not do so and submits a bid does so at their own risk All Bidding Contractors are requested to attend. BID SECURITY in an amount equal to ten percent (10%) of the total bid shall be submitted with each bid, in accordance with the Instructions to Bidders. The successful bidder will be required to furnish a Performance Bond for 100% of their bid amount and a Labor and Material Payment Bond for 100% of their bid amount within 15 days of the contract being awarded. his project is subject to the Pennsylvania Prevailing Wage Act. The project is funded by a grant from the Local Share Account (LSA) Program Grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority and all requirements of this Authority are to be met by the Bidders. The successful bid will be required to submit Non- Discrimination/Sexual Harassment Clause which is contained in the Contract Documents. Jenkins Township does not discriminate on the basis of race, color, national origin, sex, religion, age, disability of familial status in employment of the provision of service. Jenkins Township is an Equal Opportunity/Affirmative Action Employer. Jenkins Township reserves the right to reject any or all Bids or to waive informalities in the bidding. BIDS may be held by Jenkins Township for a period not to exceed Sixty (60) days from the date of the Opening of the Bids for the purpose of reviewing the bids, prior to awarding the Contract. In this period of time, no Bidder may withdraw their Bid. Bid Result : CONTRACT # 1 - GENERAL CONSTRUCTION - H & P Construction - $ 201,750 CONTRACT # 2 - HVAC CONSTRUCTION - Spotts Brothers - $ 61,600 CONTRACT # 3 - ELECTRICAL - Mark Whitehead Electrical - $ 18,250

Award

Fire / Police

$281,600.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Roof and Wall Specialties and Accessories, Roof Specialties, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Windows, Composite Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers, Canopies
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Fire-Suppression Standpipes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Air Coils
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Planting, Turf and Grasses, Seeding
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
123
Bidding Soon
1,455
All Active Projects
623
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

March 11, 2022

img_map_placeholder

2 S Main St, Pittston Twp, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Jenkins Township Police Building Conversion Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.