EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 2, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a road / highway in Blue Earth, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of 03/02/2022 Awarded with $7,897,447.96 The major items of work are approximately: 2215.504 FULL DEPTH RECLAMATION 333,939 S Y 2221.509 SHOULDER BASE AGGREGATE CLASS 5 24,270 TON 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) 928 TON 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) 89,749 TON 2582.503 6" SOLID LINE PAINT 266,434 L F Bids must be accompanied by a Certified Check or Bid Bond made payable to the Treasurer of Faribault County for at least 5% of the amount bid. The County reserves the right to reject any or all bids and to waive any irregularities thereof. PROJECT NO. SAP 022-621-028 SAP 022-628-005 SAP 022-629-004 SAP 022-630-009 SAP 022-631-012 CP 022-600-010 Full Depth Reclamation and Bituminous Overlay Full Depth Reclamation and Bituminous Overlay Full Depth Reclamation and Bituminous Overlay Full Depth Reclamation and Bituminous Overlay Full Depth Reclamation and Bituminous Overlay 1 1/2 " Bituminous Overlay Contractor must complete all Work before 11/4/2022. LOCATION: CSAH 21 (510th Ave) from CSAH 2 to CSAH 16 CSAH 28 (60th St.) from TH 22 to East County Line CSAH 29 (570th Ave) from TH 22 to North County Line CSAH 30 (90th St.) from CSAH 31 to East County Line CSAH 31 (600th Ave) from CSAH 16 to TH 109 Unity Trail from Westbound I-90 Rest Stop to CSAH 44 in Blue Earth

Award

Roads / Highways

$7,897,448.00

Public - County

Paving, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
16
Bidding Soon
190
All Active Projects
71
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

April 11, 2022

img_map_placeholder

Multiple Locations, Blue Earth, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.