BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lancaster, Pennsylvania. Completed plans call for site work for a water / sewer project.

The project bid consists of one (1) unit price contract. The work in connection with this project constitutes a Public Works by a Public Body under the Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, which must be paid to workers employed on this project, are incorporated in the Contract Documents. Bidders are advised that they must comply with all State anti-kickback regulations pertaining to work associated with this project. After the Bid opening, Bids may be withdrawn only by complying with Commonwealth of Pennsylvania laws and regulations. A summary of such laws and regulations is given in the Instructions to Bidders. Bids shall remain open for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a government agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. See Instructions to Bidders for other provisions on the time available for acceptance of Bids. Each Bid must be accompanied by Bid security in the form of a certified check, bank check, or Bid bond (in the required form) for ten percent of the Bid total in the same fashion as all other submittals that are made with the Bid. The lowest responsible bidder shall submit the actual Bid security to the Authority within three (3) business days after bid opening. The LANCASTER AREA SEWER AUTHORITY hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, mistakes, defects or irregularities in any Bid. The SCOPE OF WORK to be performed under this contract consists of the furnishing of all material and the construction, complete in place, for the Lower Little Conestoga Interceptor Rehabilitation Project - Phase 3 including but not limited to: pipe rehabilitation, CCTV inspection, sewer cleaning, CIPP lining, manhole/structure rehabilitation lining, and all general requirements, appurtenances and incidental items of work . Deadline for questions was February 18, 2022 at 12:00 PM. Project expected value range is $3,500,000 to $5,500,000

Bid Results

Water / Sewer

$3,753,300.00

Public - County

Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
123
Bidding Soon
2,259
All Active Projects
1,022
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2022

April 1, 2022

img_map_placeholder

Multiple Locations, Lancaster, PA

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.