BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2022 at 8:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Siksika, Alberta. Completed plans call for site work for a water / sewer project.

2021 CANAL SLIP REPAIRS - CARSELAND - BOW RIVER HEADWORKS SYSTEM (CBRH) Major Capital Projects APPROXIMATE QUANTITIES: 1 Lump sum Existing and Temporary Roads 4,500 square metres Topsoil and Subsoil Stripping and Placement 7,500 Cubic metres Wet Excavation Type 2 1,650 tonnes Supply and Install Road Gravel Zone 4B 15,600 tonnes Supply and Install Pitrun Gravel Zone 4C 650 tonnes Supply and Install Gravel Armour Zone 5C 4,500 Square metres Seeding Contractor to supply all materials. Documents can be obtained from www.purchasingconnection.ca.

Award

Water / Sewer

$522,035.00

Public - State/Provincial

Site Work

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
0
Bidding Soon
240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2022

February 21, 2022

Project location map

CBRH Canal Bank Failure – Located 6km SE of Shouldice, Siksika, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.