BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Shillington, Pennsylvania. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Last Day for Question 2/8/2022 Governor Mifflin School District Community Athletic Building BIDS ARE INVITED ON A LUMP SUM BASIS FOR THE FOLLOWING PRIME CONTRACTS: Contract #1 - General Construction Contract #2 - Site Construction Contract #3 - Fire Protection Systems Construction Contract #4 - Plumbing Systems Construction Contract #5 - HVAC Systems Construction (ESSER Funded Contract) Contract #6 - Electrical Systems Construction Electronic or faxed bids will not be accepted. No award of the contract will be made at the bid opening Notice to Proceed Goal 03/18/2022 Substantial Completion Date 08/18/2023 Earth Engineering Incorporated (EEI) has completed the geotechnical investigation for a 2-story steel framed structure (Athletic Community Building) and expansion of two (2) existing parking lots at the Governor Mifflin Middle and High School campus located at 10 South Waverly Street, Shillington in Berks County, Pennsylvania. The objective of this study was to evaluate the subsurface conditions within the proposed development areas. Based on the encountered conditions and the results of the testing performed for this project, EEI has developed preliminary geotechnical recommendations to aid in the design and construction of the proposed structures, as well as general earthwork and construction guidelines for the development of this site. This study was performed in general accordance with EEIs proposal BB-19733, dated April 1, 2021. The scope of work for this project included a test boring investigation, a geologic analysis of site conditions, laboratory testing of soil samples, pavement design and a geotechnical engineering analysis of the data obtained. The following report sections present the results of our field and laboratory investigations and documents our recommendations regarding the geotechnical engineering aspects of this project. Estimated Costs of the Bid Packages: 1 General Construction $12,205,000 2. Site Construction $5,030,000 3. Fire Protection Systems Construction $360,000 4.Plumbing Systems Construction $1,235,000 5. HVAC Systems Construction - ESSER Funded Contract $3,300,000 6. Electrical Systems Construction $2,350,000 *This project has been identified as part of a stimulus package

Award

Educational

$24,480,000.00

Public - City

New Construction, Site Work

289

38

283

2

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
114
Bidding Soon
2,112
All Active Projects
970
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

May 9, 2022

img_map_placeholder

10 S Waverly St, Shillington, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.