BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a sidewalk / parking lot in Wichita Falls, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project is generally described as the construction of two new reinforced concrete parking lots to serve the MPEC which generally includes site demolition/preparation, removal/replacement of approximately 570 SY of asphalt pavement and the construction/installation of approximately 460 LF of curb & gutter, 15,440 SY of 6" concrete paving (9,860 SY-Base Bid & 5,580 SY Additive Bid), 800 SY of 6" reinforced concrete drive approach, 945 SY of 4" reinforced concrete sidewalk, pedestrian ramp/crossings, 16 RV Hookups (electrical and water), site lighting, irrigation, landscaping, and associated work. The Engineer's Estimate of Probable Cost of Construction for this project is $2,062,635 (Base Bid and Additive). Questions regarding this project should be directed to Rick Branum, Project Manager, at (940) 761-7477. his specification covers Resilient-Seated Gate Valves in sizes 3" through 12" which conform to features and material specifications of AWWA C509, latest revision, as minimum. The valves shall be bi-directional, non-rising stem with a minimum rated working pressure of 200 psig. Tapping valves which allow 1/2" undersize cutters shall be provided, ifspecified. All tapping valves shall be designed with an alignment lip per MS SSP-60. The valve operating nut shall be painted black and open in a counter-clockwise direction. The water way shall be full-port. No recesses, insets, etc. shall be allowed in the bottom ofthe waterway which would allow build-up or collection ofresidue and debris. Description of Work: this item governs the materials used, the storing and handling ofmaterials, and the proportioning and mixing of concrete for bridges, pavements, culverts, prestressed concrete, and other concrete construction for the City ofWichita Falls. Cement concrete is composed of Portland cement, aggregates (fine and coarse), admixtures if desired or required, and water, proportioned and mixed as hereinafter provided.

Bid Results

Sidewalks / Parking Lot

$1,602,976.00

Public - City

Paving, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
22
Bidding Soon
395
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2022

April 4, 2022

Project location map

1000 5th St, Wichita Falls, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.