BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Toledo, Ohio. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Waterfront: Removal of Old Fendering System, Supply and Install New Fendering, Repair Sheet Pile Wall, and Create New Drainage Openings in the Sheet Pile Wall. Remove and Replace the Sheet Pile Concrete Cap. Dock Surface: Remove Existing Crane Rails, Remove Pavement to 50 Feet From Sheet Pile Wall, Removal Electrical Manholes and Conduit, Furnish and Install New Drainage, Backfill and New Pavement. Pavement Will Also Be Required Between Tracks in the Areas of the Track Where There Are Turnouts or Switches. In Addition, Tie Backs, as Directed on the Drawings, Should Be Completely Dug Up So That They May Be Inspected. A Portion of the Existing Storm System Will Need to Be Reworked Including a Lift Station. This Will Require Excavation, New Pipe, Manholes, Backfill and Discharge Through the Sheet Pile Wall. The Electrical Power for the Lift Station Is to Be Coordinated With the Electrical Contractor. Railroad Track: Track Is to Be Removed and Replaced, Including Ballast. Precast Concrete Crossing Panels Will Also Be Installed Along the Tangent Portions of the Track. The Base Bid for the Dock Surface and Rail Would Be Too Non-perform Replacement Between 0+00 and 2+50 and Also 37+00 to 41+60. The Alternate for This Area Would Be to Remove and Replace as Indicated. Phasing: the Port of Toledo Operations Will Continue Through Construction. As Such, the Dock Face Reconstruction Will Be Completed in Sections Along the Dock. All Work Must Be Completed in a Section of the Dock (Including Rail and Pavement) Prior to Moving to the Next Section. The Drawings Currently Show 5 Phases to Complete the Dock Restructuring. The Order and Location of These Phases Are Indicated on the Drawings, However, Toledo-lucas County Port Authority and Midwest Terminals of Toledo Inc., May Reorder the Phases During Construction to Fit the Shipping Schedule. General: This Is a Lump Sum Bid. All Quantities Shown on the Bid Sheet Are to Be Verified With the Plan Documents by the Bidder. The Sum of the Line Items May Not Add Up to Your Total Lump Sum Fee. These Unit Prices Are to Be Used in the Event of an Owner Directed Change to the Contract Documents. This Project Is Funded Through a U.s. Dept. Of Trans. Maritime Administration (Marad) Pidp Grant and an Ohio Maritime Assistance Program Grant (Map). The Engineer's Estimate for Component 2: Reconstruction of Dock Face Phase 3 - Rebid Combined Total Is Approximately $13,200,000.00. The Base Bid Is Approximately $11,800,000.00, and Alternates 1 Through 6 Are Approximately $1,400,000.00. Bids That Are in Excess of 10% Above the Engineer's Estimate Would Be Considered Non-responsive. This Project May Be Awarded by the Toledo-lucas County Port Authority at Its Sole Discretion. Only Qualified Contractors Are Eligible to Submit Bids for This Project. Contractor Qualification Status Must Be in Force at the Time of Bidding, at the Time of Award, and Through the Life of the Construction Contract. Please Submit All Questions to the Port Authority, Tina Perkins at Tperkins@toledoport.org by Wednesday, May 18, 2022, at 10:00 Am Local Time.

Bid Results

Water / Sewer

$11,310,000.00

Public - County

Paving, Site Work

33

5

6

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
177
Bidding Soon
2,560
All Active Projects
978
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 25, 2022

July 25, 2022

December 7, 2023

img_map_placeholder

3518 St Lawrence Dr, Toledo, OH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.