Renovation of a power facility in Lubbock, Texas. Completed plans call for the renovation of a power facility.

As of 3/16/2022 project was not yet been awarded. Estimated award date March 21, 2022 LP&L Thompson Substation Capacity Upgrade Construction Services *Please note LP&L will not have a site visit and is the Offerors responsibility to familiarize themselves with the sites Expected award date is March 15, 2022. Engineer's Estimated Cost: $950,000.00 Construction start: May 19, 2022 Substation Completion: September 19, 2022 Final Completion: October 17, 2022 The construction work covered by these specifications is for the Lubbock Power & Light (LP&L) Thompson Substation located at approximately 5691 Bangor Ave, Lubbock, TX 79414. The project includes the installation of the following equipment and systems: 1 - 115/22.86kV 50MVA Transformer 4 - 27kV 2000A Breakers with SEL-351S & SEL-551 1 - 27kV 2000A Breakers with SEL-351S 1 - 115kV 3000A Breaker 1 - 1 Phase 115kV PT 3 - 1 Phase 23kV PT 1 - Station Service Transformer, 50KVA, 120/240V SEC, 1 Phase 1 - Shield mast and shield wires 2 - 115kV 3000A Horizontal Mounted Switches with stand 1 - 115kV 2000A Horizontal Mounted Switch with stand 1 - 23kV 2000A Horizontal Mounted Switch with stand 12 - 23kV Vertically mounted hook-stick switches 12 - 23kV Vertically mounted tandem hook-stick switches 1 - 25kV 3-phase bus support structure 1 - 25kV distribution bay structure (4 positions) 4 - 25kV distribution terminator stand structures 9 - 115kV 1 Phase Bus Supports 1 - Pullbox 3 - Manholes New Fiber, Power and Control Cable to Equipment New above and below grade conduit New grounding conductor and ground terminations to new equipment 1 - Distribution Transformer #3 and TH300 Breaker Control Relay Panel 1 - 22.86 Bus #3 Differential and Feeder Breaker Control Relay Panel 1 - 115kV 1 Phase PT Junction Box 1 - 23kV 3 Phase PT Junction Box 1 - 120/240 VAC Station Service Outdoor AC Panelboard 1 - Remote Terminal Unit Cabinet 1 - SEL 3530 RTAC in existing panel 1 - Multimode fiber optic patch and splice panel in existing cabinet *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Power Plant

$755,322.00

Public - State/Provincial

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
10
Bidding Soon
209
All Active Projects
79
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2022

May 26, 2022

img_map_placeholder

5691 Bangor Ave, Lubbock, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.