Site work for a playground / park / athletic field in New Paltz, New York. Working plans call for site work for a playground / park / athletic field.
As of April 11, 2022, the Owner has decided to rebid this project. The documents have been updated since the previous bid and can only be obtained by contractors who have previously submitted a bid. The project includes the development of field-side amenities adjacent to both the North Turf Field and the South Turf Field on the west side of the SUNY New Paltz. The proposed amenities at the South Field included spectator seating to be located on the east side of the field, and a filming tower with storage area to be positioned on the west side of the field. The spectator seating will provide approximately 200 seats placed on an elevated pad. The elevated pad is gravity block wall system backfilled with aggregate and topped with asphalt paving. The field-side pad wall will receive a metal handrail. The manufactured bleacher units will be provided by the owner and installed by the contractor. The filming platform and storage enclosure are manufactured items to be provided and installed by the contractor atop a cast-in-place concrete pad. Electrical and data serving these amenities will be installed within existing and new conduit back to Lenape Hall. Data cabling will be pulled by the campus. The proposed amenities at the North Turf Field also include a filming tower with storage area to be positioned on the west side of the field. The filming platform and storage enclosure are manufactured items to be provided and installed by the contractor atop a cast-in-place concrete pad. Power to the new tower will be pulled through an existing conduit from the Storage building on the east side of the field. A new conduit for data will be installed between the softball field and turf field to allow the campus to pull new data cabling from the Elting Gym Building. Contractor shall provide and maintain full access and egress in and out of the area at all entry locations and non-work areas and at all times, and especially for emergency vehicles. Contractor, Contractors employees, and all sub-contractors to Contractor shall park employee vehicle(s) in the College approved location during all times of work, and each contractor and sub-contractor employee shall purchase a contractor parking hang tag for the duration of the work period, no exceptions. Providing all labor, supervision, project coordination, tools, equipment, demolition, legal removals, and the legal recycling, disposal, and reporting of all construction waste for the renovation of the work. Contractor shall be fully responsible to review all existing conditions, all dimensions, all material quantities necessary, and all new work indicated or shown; and as fully coordinated with all construction documents and specifications prior to bidding. Contractor shall provide daily project clean-up of debris created by the Work, restoration of existing adjacent areas disturbed by this contract work, and final cleaning of all areas of the completed Work. All work shall be completed in accord with applicable manufacturer's materials standards; applicable NYSDOT Standards, NY State Building Code requirements, and applicable Federal & State regulation. Contractor shall follow and adhere to the Campus Impairment Program, and especially in regards to any welding work, and Contractor shall not disrupt the existing campus fire alarm system during the work, no exceptions. Contractor shall provide temporary fencing as stated in the General Requirements Section D - Special Conditions, line 4 "Staging Area/Storing of Materials, and Construction Fencing". All dumpsters and storage trailers shall have solid wood members placed under wheels of these items to protect existing conditions, and dumpsters shall be placed on asphalt paving, unless approved in advance by College. Locations of these items must also be approved by College before any deliveries or installation, no exception. Contractor shall leave work area in a ready to use condition without the College having to clean any areas of work where Contractor performed work. Work not included in the work of the Contract shall be coordinated with the college, and shall include the work listed below, but not be limited to the following: Any direct work associated with other projects by the College or by other Contractors near the work areas, but Contractor for this project shall coordinate their work as necessary. Other Work not included in the work of this Contract are those items marked "N.I.C"; and/or work specifically specified or indicated on the drawings, marked "by others" or "by University "or by College". With their Bid Documents, Contractor shall submit a preliminary construction schedule to the College indicating how they can complete the work by the substantial completion dates stated above. Benchmark dates for major parts of the work as referenced with the specifications shall be listed in the schedule. Reference Section 22 - CPM Schedule for further information. The College's Spring and Summer Semesters will be in operation on campus The Contractor shall coordinate his Work with the College and provide portable fencing and temporary pathways as necessary to reroute traffic to and from buildings around the work areas during this construction period, but as approved by College. The Contractor shall employ sufficient trained, skilled work crews and provide adequate equipment and work crews as necessary to comply with the Project Schedule and complete the Work during this construction period. Bidding and Contract Documents may be examined free of charge at the campus and at the following locations. SUNY New Paltz Design & Construction Service Building 94 S. Manheim Blvd. New Paltz, NY 12561-2443. Point of Contact: Elissa E. Greene. Section 143 of the State Finance Law requires payment of a deposit to receive these documents. Bids must be submitted in duplicate in accordance with the instructions contained in the Information for Bidders. Security will be required for each bid in an amount not less than five (5) percent of the Total Bid. It is the policy of the State of New York and the State University of New York to encourage minority business enterprise participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy. The State University of New York reserves the right to reject any or all bids.
Final Planning
Playgrounds / Parks / Athletic Fields
$388,300.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2022
May 1, 2022
1 Hawk Dr, New Paltz, NY
Related To This Project
New Paltz, NY
Bid Date: Oct 13 2023
New Paltz, NY
Bid Date: Oct 17 2023
New Paltz, NY
--
New Paltz, NY
Bid Date: Nov 21 2023
New Paltz, NY
Bid Date: Nov 28 2023
New Paltz, NY
--
New Paltz, NY
--
New Paltz, NY
--
New Paltz, NY
Bid Date: Mar 01 2022
New Paltz, NY
Bid Date: Mar 17 2022
New Paltz, NY
--
New Paltz, NY
Bid Date: Feb 07 2022
New Paltz, NY
Bid Date: Jan 21 2022
New Paltz, NY
Bid Date: Dec 30 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.