BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Tinley Park, Illinois. Completed plans call for the renovation of a educational facility.

Project includes a new natural gas generator and electrical improvements with associated site work, poured in place concrete pad, chain link fencing, interior ceiling repairs, interior gypsum board repairs, floor patching and other Work indicated in the Contract Documents. The prebid meeting will be conducted in a manner consistent with Local and State Covid-19 related guidelines. Anyone visiting the school will need to comply with District, Local and State requirements, including face covering/masks (PPE), social distancing, self-certification of any active Covid-19 related illnesses, and use of hand sanitizer. Additional visits to the site may be arranged by contacting Owner's Representative. Bidders shall visit the site and familiarize themselves with the conditions under which the work is to be performed. Successful bidder shall begin the Work on receipt of the Notice to Award and shall complete the Work within the Contract Time. Work is subject to liquidated damages. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. The successful bidder will be required to furnish a Performance Bond and a Payment Bond, in the amount of one hundred percent (100%) of the contract sum, on AIA Document A312, as issued by the American Institute of Architects. Any bid submitted unsealed, or unsigned, without bid bond or received subsequent to the aforementioned date and hour will be disqualified and returned to the bidder. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. Bid Security is required in the form of a Bid Bond, AIA Document A310 in an amount equal to not less than ten percent (10%) of the Base Bid and all Additive Alternates. It is the Owner's intent to issue a Notice of Award to the successful Bidder within thirty (30) calendar days of the Bid Date. No bid shall be withdrawn for a period of sixty (60) calendar days after the opening of bids.

Post-Bid

Educational

$150,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
90
Bidding Soon
1,751
All Active Projects
777
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2022

March 7, 2022

img_map_placeholder

17303 Central Ave, Tinley Park, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.