Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 11, 2025 at 7:00 PM
Updated November 12, 2025
Site work and paving for a bridge / tunnel in New London, Connecticut. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The Southbound Gold Star Memorial Bridge will undergo construction to widen the existing sidewalk to a shared use pathway, which will follow the completion of the Steel Strengthening of the Southbound Bridge project. As of November 11, 2025, this project is in the design phase. VHB is the lead designer with HNTB handling the approaches to the bridge sidewalk. Construction is anticipated to take place in 2028 and 2029.
Design
Bridges / Tunnels
$55,000,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
