BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of an educational facility in Worcester, Massachusetts. Completed plans call for the demolition of a educational facility; for site work for a educational facility; and for the construction of a educational facility.

Contractor Qualification DCAMM Certificate Doherty Memorial High School Sub Bid Deadline 2/17/22 Time 11:00 A.M. Sub Bid Category Masonry, Metal Fabrications, Waterproofing, Roofing, Metal Windows, Glazing, Tiling, ACT, Resilient Floors, Painting, Elevator, Fire Suppression, Plumbing, HVAC, Electrical Trade Bidders have been pre-qualified for this project. Bids will be received only from bidders that will be notified by the City as being pre-qualified. Only Pre-qualified Trade Contractors Can Bid This Project. Construction Participation: Combined MBE/WBE goal of (10.4%). Replacement of the existing High School with a new, 1,670 student High School, constructed adjacent to the existing high school. The project scope generally consists of constructing a new 424,600+ SF building including classrooms, administrative office areas, Media Center, Gymnasium, Cafeteria, Auditorium, Kitchen/Serving, and a 45,547sf parking garage. The new building is multi-story (on five main levels, one grade floor); fireproofed steel-framed; masonry veneer, metal composite panel; with single-ply membrane roofing, aluminum windows, and with all associated work including site work, architectural, food service, structural, elevators, fire suppression, plumbing, HVAC, electrical, and voice/data/ communications work. Site work generally includes earthwork, utilities, paving, sports field, lawns, plantings, site improvements and other items as indicated in the drawings and specifications. The project is a Chapter 149A Project; the Construction Manager (CM) is Fontaine-Dimeo JV and the Owner's Project Manager is Aecom Tishman. This work is a phased project with early bidding and early construction consisting of enabling site work at the existing school to add parking, access and separation of the existing site from the construction site which has been completed; followed by early sitework, structural (concrete and steel) bid, including foundation waterproofing works that are ongoing. Under this bid phase; general bidding, construction and occupancy of the school building; followed by the parking lot construction; and lastly the sports field construction. Refer to the detailed schedule and phasing plan published herein. Bid Results MASONRY - Fernandes Masonry, Inc - $4,345,000.00 MISC METALS - United Steel - $5,700,000.00 ATERPROOFING AND CAULKING - Superior Caulking & Waterproofing Co., Inc - $1,320,000.00 ROOFING - Greenwood Industries Inc. - $4,787,000.00 METAL WINDOW - Lizotte Glass, Inc. - $451,550.00 GLASS AND GLAZING - Lizotte Glass, Inc.$314,651.00 TILE - Ayotte & King for Tile - $5,390,000.00 ACOUSTICAL CEILINGS - Central Ceilings Inc - $3,171,000.00 RESILIENT FLOORING - Capital Carpet and Flooring - $1,738,478.00 PAINTING - King Painting Inc - $1,275,000.00 ELEVATORS - Delta Beckwith Elevator Company - $778,000.00 FIRE SUPPRESSION - Rustic Fire Protection, Inc. - $2,499,000.00 PLUMBING - Harold Brothers Mechanical Contractors, Inc - $9,212,000.00 HVAC - KMD Mechanical Corp. - $27,455,000.00 ELECTRICAL - Ostrow Electrical Co., Inc - $30,360,000.00

Bid Results

Educational

$98,796,679.00

Public - City

Demolition, New Construction, Site Work

Subscribe For Documents

122 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
351
Active Projects
181
Bidding Soon
3,274
All Active Projects
1,356
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2022

May 2, 2022

img_map_placeholder

299 Highland St, Worcester, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.