BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2022 at 7:00 PM

Updated November 16, 2023

Site work and paving for a road / highway in Hamilton, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Hamilton Beltline Trail Phase 2 for furnishing of all necessary permits, labor, material, and services necessary for: Contract 22-03, Hamilton Beltline Trail Phase 2 (the "Project"), as more fully described in the Contract Documents prepared by City of Hamilton (Design Professional"). Bids will not be accepted after this time. Subject to the right of the Owner to reject any or all bids, the Owner will award contracts to the bidder(s) submitting the lowest and best responsible bid(s). Any questions must be received by the Owner through Bid Express no later than 2:00 pm, local time, on Thursday, January 27, 2022 in order to provide an addendum to all plan holders In general, the improvements on which proposals are requested will be as described below: 0.64 miles of 10-ft wide asphalt trail 5155 feet of wooden railing and other appurtenances necessary to complete the project. Notice is also posted on the City's web site, click on Services then Bids & Quotes, or by query directly at www.bidexpress.com. The electronic bids can only be submitted through Bid Express and must be electronically endorsed by the Bidder. Contract documents are available through the Bid Express Website at: www.bidexpress.com. Registration with Bid Express is free and allows for the Bidder to review, download, and print all contract documents. A digital ID along with a per bid fee of $25.00 or a $50.00 monthly subscription will be required for the Bidder to submit an electronic bid. Contact information for Bid Express; Phone (888)-352-2439, Fax (888) 971-4191, Email support@bidexpress.com. This is an Ohio Prevailing Wage project. No Bidder may withdraw its bid within sixty (60) days after the bid opening. The Owner reserves the right to waive irregularities in bids, to reject any or all bids, and to conduct such investigation as necessary to determine the lowest and best responsible bidder(s). Ken Snyder Purchasing Agent Joshua A. Smith City ManagerCity of Hamilton Contract# 22-03 Hamilton Beltline Trail Phase 2 Project Information Sheet Description 0.63 miles of 10-ft wide asphalt trail. The project also includes 5155 feet of wooden railing and other appurtenances. Project Funding Parks and Recreation Improvement Fund (Fund 7035) and Local Prevailing Wage Requirement State Project Owner City of Hamilton 345 High Street, Hamilton, Ohio 45011 Advertise Date 1/19/22 Bid Opening Where: City of Hamilton Purchasing Division 345 High Street, Suite 450, Hamilton, Ohio 45011 When: 2/2/2022 at 2:00 PM Substantial Completion Date May 20, 2022 Final Completion Date June 10, 2022 0.63 miles of 10-ft wide asphalt trail. The project also includes 5155 feet of wooden railing and other appurtenances.

Bid Results

Roads / Highways

$504,780.00

Public - City

Paving, Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
137
Bidding Soon
1,986
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2022

March 7, 2022

Project location map

To Be Determined, Hamilton, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.